Textbook Question
Chapter 12, Problem 11P
Given a table with production and attraction data, determine the number of productions and attractions that should be used for each zone in the second iteration.
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
HBW stands for Home based work
In a survey in the base year, the trip attraction, number of employees and shopping area in the zones are found
as follows:
Zone
1
2
3
4
5
6
7
8
9
10
Trip attraction
(Trips/day)
34,000
33,000
37,000
9,000
19,000
20,000
50,000
22,000
21,000
5,000
Number of employees
(persons)
2000
1500
3000
500
1000
1000
3200
1800
1600
200
Shopping area (m²)
250,000
350,000
150,000
80,000
160,000
180,000
350,000
60,000
100,000
50,000
Prepare a excel worksheet to calculate the generation model by regression analysis.
Assume you have to carry out a land use planning task which includes designing a new community within an Urban Growth Center of your choice within the GGH region. Your deliverables are as given below:
Name the urban growth center that you have chosen and copy its map from the lecture slides.
Provide the population growth and jobs growth target given to your urban growth center by the GGHP (refer to lecture slides).
Provide calculation of exactly how many people and how many jobs will you plan for based on your growth target given (scale the area of your urban growth center for calculations).
Assuming density and intensity numbers, provide a land use sketch of your designated Urban Growth Center showing land use designations that you will provide to cater for your calculated number of people and jobs.
Chapter 12 Solutions
MindTap Engineering for Garber/Hoel's Traffic and Highway Engineering, 5th Edition, [Instant Access], 1 term (6 months)
Ch. 12 - Prob. 1PCh. 12 - Prob. 2PCh. 12 - Prob. 3PCh. 12 - Prob. 4PCh. 12 - Prob. 5PCh. 12 - Prob. 6PCh. 12 - Prob. 7PCh. 12 - Prob. 8PCh. 12 - Prob. 9PCh. 12 - Given a table with production and attraction data,...
Ch. 12 - Given a table with production and attraction data,...Ch. 12 - Prob. 12PCh. 12 - Prob. 13PCh. 12 - Prob. 14PCh. 12 - Prob. 15PCh. 12 - Prob. 16PCh. 12 - Prob. 17PCh. 12 - Prob. 18PCh. 12 - Prob. 19PCh. 12 - Prob. 20PCh. 12 - Prob. 21PCh. 12 - Prob. 22PCh. 12 - Prob. 23PCh. 12 - Prob. 24PCh. 12 - Prob. 25PCh. 12 - Prob. 26PCh. 12 - Prob. 27PCh. 12 - Prob. 28P
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- The following table shows the productions and attractions used in the first iteration of a trip distribution procedure andthe productions and attractions that resulted. Determine the number of productions and attractions that should be usedfor each zone in the second iteration.arrow_forwardConsider the following project network. Determine the critical path and the project duration. D 2 B 4 E 1 G 3 A 2 F 8 H 5 Start Finish C 5 4arrow_forwardNEED ANSWER ASAParrow_forward
- Miami, Oklahoma has three transportation analysis zones, and origin-destination survey results. Using a spreadsheet, provide a trip distribution calculation using the gravity model. The following table shows the number of productions and attractions in each zone, as well as the socioeconomic adjustment factor.arrow_forwardA developer is building a 60-unit apartment building. Construction will take 15 months covering all of Year 0 and the first 3 months of Year 1. Tenants will begin moving in the first day of Month 4. Lease up is expected to occur at a rate of 10 units per month until reaching full (100%) occupancy (e.g., 10 units occupied in Month 4, 20 units occupied in Month 5, etc.) What forecasted vacancy rate (average vacancy for the year) should be used for Year 1 in the pro forma? Assume 100% occupancy once fully leased up. (CAUTION: The question asks for the VACANCY percent, NOT occupancy percent.) (%)arrow_forwardCONSTRUCTION METHOD AND PROJECT MANAGEMENT 3. The owner of a shopping center is considering modernizing and expanding the current 32-business shopping complex. He hopes to add 8 to 10 new business or tenants to the shopping complex. The specific activities that make up the expansion project, together with information on immediate predecessor and completion time, are listed in the following table. (a) What is the total completion time of the project? (b) What are the scheduled start and completion time for each activity? (c) Which activities are critical and must be completed exactly as scheduled in order to keep the project on schedule? (d) How long can the non-critical activities to be delayed before they cause a delay in the completion time for project? Time (days) Activity A B C D E F G H I Immediate Predecessor A A A E D, F B, C G, H po Completion Time (Weeks) 5 6 4 133 3 1 4 14 12 2arrow_forward
- A study area consists of three zones. The data have been determined as shown in the following tables. Zone Productions and Attractions Zone 1 2 3 Total Trip Productions 140 330 280 750 Trip Attractions 300 270 180 750 Travel Time between zones (min) Zone 1 3 1 5 3 2 3 3 5 Travel Time versus Friction Factor Time (min) F 1 82 2 52 3 50 4 41 5 39 6 26 7 20 8 12 Determine the number of trips between each zone using the gravity model. Show all steps in the calculation of friction factors and iterations for balancing attractions and productions. 6.arrow_forwardUse a weighted unit cost to determine the conceptual cost estimate for a proposed parking that is to contain 350 stored cars. Previous project data is given in the table.arrow_forwardQ3 / Find the critical path and (Es, EF, Lf, TF) for the activities of the project and determine the total project duration if you have the following information )5٠ درجة( Activity Duration 1-2 2-3 4 2-4 2-5 6. 3-5 3-6 4-5 4-7 3 5-8 7 6-8 6-9 7-8 7-10 5 8-10 9-10 4arrow_forward
- Q #3. Draw bar chart for activities for a house construction projectarrow_forwardFigure shows the network for a construction project, with the three time estimates of each activity marked. Determine; 1. Critical path and its standard deviation. 2. Probability of completion of project in 45 days. 3. Time duration that will provide 90% probability of its completion in time.arrow_forwardFor one of the construction projects, draw the (PERT) network diagram and find the following:arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage LearningFundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,
What Is A Construction Takeoff? | Are They Still Necessary In Quantity Surveying?; Author: Metroun Quantity Surveying;https://www.youtube.com/watch?v=uTWoDPtcOjg;License: Standard Youtube License