Bundle: Sustainable Energy, 2nd + Mindtap Engineering, 1 Term (6 Months) Printed Access Card
Bundle: Sustainable Energy, 2nd + Mindtap Engineering, 1 Term (6 Months) Printed Access Card
2nd Edition
ISBN: 9781337896535
Author: Richard A. Dunlap
Publisher: Cengage Learning
bartleby

Concept explainers

Question
Book Icon
Chapter 11, Problem 1P
To determine

Find the final temperature of water.

Expert Solution & Answer
Check Mark

Answer to Problem 1P

The final temperature of water is 20.23°C¯.

Explanation of Solution

Given information:

The mass of one cubic meter water m is 1,000kg.

The vertical height h is 100m.

The initial temperature T0 is 20°C

Calculation:

Take the gravitational constant g as 9.8m/s2.

Find the potential energy at the height h E as follows:

E=mgh=1,000kg×9.8m/s2×100m=98×104J

Take the specific heat of water C as 4,186J/kg°C.

Calculate the change in temperature ΔT as follows:

ΔT=EmC=98×104J1,000kg×4,186J/kg°C=0.23°C

Find the final temperature of water T as follows:

T=T0+ΔT=20°C+0.23°C=20.23°C

Therefore, the final temperature of water is 20.23°C¯.

Want to see more full solutions like this?

Subscribe now to access step-by-step solutions to millions of textbook problems written by subject matter experts!
Students have asked these similar questions
Thumbi Irrigation Scheme in Mzimba district is under threat of flooding. In order to mitigate against the problem, authorities have decided to construct a flood protection bund (Dyke). Figure 1 is a cross section of a 300m long proposed dyke; together with its foundation (key). Survey data for the proposed site of the dyke are presented in Table 1. Table 2 provides swelling and shrinkage factors for the fill material that has been proposed. The dyke dimensions that are given are for a compacted fill. (1) Assume you are in the design office, use both the Simpson Rule and Trapezoidal Rule to compute the total volume of earthworks required. (Assume both the dyke and the key will use the same material). (2) If you are a Contractor, how many days will it take to finish hauling the computed earthworks using 3 tippers of 12m³ each? Make appropriate assumptions. DIKE CROSS SECTION OGL KEY (FOUNDATION) 2m 1m 2m 8m Figure 1: Cross section of Dyke and its foundation 1.5m from highest OGL 0.5m…
this is from CE-192
The head-vs-capacity curves for two centrifugal pumps A and B are shown below: Which of the following is a correct statement at a flow rate of 600 ft3/min? Assuming a pump efficiency of 80%. Head [ft] 50 45 40 35- 30 25 20 15 10 5. 0 0 Pump B Pump A 100 200 300 400 500 600 700 800 900 1000

Chapter 11 Solutions

Bundle: Sustainable Energy, 2nd + Mindtap Engineering, 1 Term (6 Months) Printed Access Card

Knowledge Booster
Background pattern image
Civil Engineering
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Sustainable Energy
Civil Engineering
ISBN:9781337551663
Author:DUNLAP, Richard A.
Publisher:Cengage,
Text book image
Engineering Fundamentals: An Introduction to Engi...
Civil Engineering
ISBN:9781305084766
Author:Saeed Moaveni
Publisher:Cengage Learning
Text book image
Sustainable Energy
Civil Engineering
ISBN:9781133108689
Author:Richard A. Dunlap
Publisher:Cengage Learning