EBK NUMERICAL METHODS FOR ENGINEERS
7th Edition
ISBN: 9780100254145
Author: Chapra
Publisher: YUZU
expand_more
expand_more
format_list_bulleted
Textbook Question
Chapter 11, Problem 15P
Of the following three sets of linear equations, identify the set(s) that you could not solve using an iterative method such as Gauss-Seidel. Show using any number of iterations that is necessary that your solution does not converge. Clearly state your convergence criteria (how you know it is not converging).
Set One | Set Two | Set Three |
|
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
In a hybrid-engine vehicle, energy from battery (“b" in Amperes) and from 95 octane unleaded gasoline
("g" in liters) are used intermittently to maximize the distance to be travelled (mileage) between fill-
ups and charge-ups. If mileage (M) in kilometers is found out to be:
M= 90 b+ 100 g - 3 b' - 5 g? - 2 b g
find the values of “b" and “g" that will maximize mileage M, find the maximum mileage and prove that
this is a maximum.
Assume that a developer is planning to construct a small neighborhood shopping strip of 10,000 sq.
ft in county 3 (figure below). There are two existing centers, A and B, in counties 1 and 2,
respectively. The distance between the counties is the same, 20 minutes. As in the example in the
book, assume that the distance increases by 1 for every 5 minutes. Thus, T12 = T13 = T23 = 4. It takes
a resident living in a county less than 5 minutes to reach a center in the same county, that is, T11 =
T22 T33 = 1. The parameter b in the book formula 3.4 is equal to 2.
County 1
Center A
Size: 10,000 sf
County 3
Project: Construct
Center C
Size: 10,000 sf
County 2
Center B
Size: 15,000 sf
1) What is the probability that a resident of county 1 shops at the new center in county 3?
The AMA makes electric bike investment. One out of every 50 electric bike is faulty, but AMA doesn't know which ones are faulty until a buyer complains. Suppose AMA makes a 150 Php profit on the sale of any working electric bikes, but suffers a loss of 4000 Php for every faulty gadget because they have to repair the unit. Check whether AMA can expect a profit in the long term.
Chapter 11 Solutions
EBK NUMERICAL METHODS FOR ENGINEERS
Ch. 11 - 11.1 Perform the same calculations as in (a)...Ch. 11 - Determine the matrix inverse for Example 11.1...Ch. 11 - 11.3 The following tridiagonal system must be...Ch. 11 - 11.4 Confirm the validity of the Cholesky...Ch. 11 - Perform the same calculations as in Example 11.2,...Ch. 11 - Perform a Cholesky decomposition of the following...Ch. 11 - Compute the Cholesky decomposition of...Ch. 11 - Use the Gauss-Seidel method to solve the...Ch. 11 - Recall from Prob. 10.8, that the following system...Ch. 11 - 11.10 Repeat Prob. 11.9, but use Jacobi...
Ch. 11 - 11.11 Use the Gauss-Seidel method to solve the...Ch. 11 - Use the Gauss-Seidel method (a) without relaxation...Ch. 11 - 11.13 Use the Gauss-Seidel method (a) without...Ch. 11 - Redraw Fig. 11.5 for the case where the slopes of...Ch. 11 - 11.15 Of the following three sets of linear...Ch. 11 - Use the software package of your choice to obtain...Ch. 11 - Given the pair of nonlinear simultaneous...Ch. 11 - An electronics company produces transistors,...Ch. 11 - Use MATLAB or Mathcad software to determine the...Ch. 11 - Repeat Prob. 11.19. but for the case of a...Ch. 11 - 11.21 Given a square matrix , write a single line...Ch. 11 - Write the following set of equations in matrix...Ch. 11 - In Sec. 9.2.1, we determined the number of...Ch. 11 - 11.24 Develop a user-friendly program in either a...Ch. 11 - 11.25 Develop a user-friendly program in either a...Ch. 11 - Develop a user-friendly program in either a...Ch. 11 - As described in Sec. PT3.1.2, linear algebraic...Ch. 11 - A pentadiagonal system with a bandwidth of five...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, mechanical-engineering and related others by exploring similar questions and additional content below.Similar questions
- At the Pizza Dude restaurant, a 12-in. pizza costs 5.40 to make, and the manager wants to make at least 4.80 from the sale of each pizza. If the pizza will be sold by the slice and each pizza is cut into 6 pieces, what is the minimum charge per slice?arrow_forwardA certain faculty printer is shared by staff and students. Suppose that the rate of generating requests to the printer by staff is twice that of students, but that the average time to print a student printout is the same as average time for a faculty printout. If the utilization of the printer by the students is 25%, the utilization of the printer by the faculty is 50%, the overall average service time is 1 minute, what is the average time the students spend waiting for their printout (time spend in system)?arrow_forwardAt the BMV, suppose that the length of time you must wait before speaking to a customer service representative is linearly related to the number of people who are in line in front of you. If there are 8 people in line in front of you, you will wait 44 minutes, and if there are 14 people in front of you, you will wait 68 minutes. How long will you wait if there are 10 people in front of you?arrow_forward
- The annual yield per fruit tree is fairly constant at 150 pounds per tree when the number of trees per acre is 35 or fewer. For each additional tree over 35, the annual yield per tree for all trees on the acre decreases by 4 pounds due to overcrowding. How many fruit trees should be planted per acre to maximize the annual yield for the acre? What is the maximum number of pounds of fruit per acre?arrow_forwardthe full solution didn't show uparrow_forwardCivil engineers often use the straight-line equation, y = bo+b ₁x, to model the relationship between the shear strength y of masonry joints and precompression stress, x. To test this theory, a series of stress tests were performed on solid bricks arranged in triplets and joined with mortar. The precompression stress was varied for each triplet and the ultimate shear load just before failure (called the shear strength) was recorded. The stress results for n = 7 resulted in a Coefficient of Determination of 0.7589. Given that r 2_ 0.7589, give a practical interpretation of r2, the coefficient of determination for the least squares model. In repeated sampling, approximately 75.89% of all similarly constructed regression lines will accurately predict shear strength. We expect about 75.89% of the observed shear strength values to lie on the least squares line. We expect to predict the shear strength of a triplet test to within about 0.7589 tons of its true value. About 75.89% of the total…arrow_forward
- please solve within 30 minutes.arrow_forwardTwo students want to measure the acceleration a of a cart rolling down an inclined plane. The cart starts at rest and travels a distance s down the plane. The first student estimates the acceleration by measuring the instantaneous velocity v just as the cart has traveled s meters, and uses the formula a = v²/2s. The second student estimates the acceleration by measuring the time, in seconds, that the cart takes to travel s meters, and uses the formula a = 2s/t. Assume that s = 1 m, and that there is negligible uncertainty in s. Assume that v = 3.2 + 0.1 m/s and that t = 0.63 + 0.01 s. Assume that the measurements of v and t are independent. Compute the acceleration using the method of the first student. Call this estimate az. Find the uncertainty in a̟. a. b. Compute the acceleration using the method of the second shudent. Call this estimate az. Find the uncertainty in a,. Find the weighted average of a, and a, that has the smallest uncertainty. Find the C. uncertainty in this weighted…arrow_forwardRon and Tim both work as landscapers during the summer months. Due to the heat, thescheduled start time is 7am. Typically though, the crew leader is late and most days they do notactually start work until 7:30 or 8am. Ron likes to catch a quick nap while he waits, however Timusually will pick up a broom or clean to pass the time. What time would his “compensabletime” begin for Ron and Tim (assume that 7:45 is the average start timarrow_forward
- The minimum amount of time an item requires to pass through a process from beginning to end (i.e., it never waits for other items) is 124 minutes. Wages average $40 per hour. There are 5 workers in the system and the worker at the slowest station needs 32 minutes to complete his work. What is the direct labor cost ($/item)? Round to 2 decimal places.arrow_forwardNiki holds two part-time jobs, Job I and Job II. She never wants to work more than a total of 12 hours a week. She has determined that for every hour she works at Job I, she needs 2 hours of preparation time, and for every hour she works at Job II, she needs one hour of preparation time, and she cannot spend more than 16 hours for preparation. Let x = The number of hours per week Niki will work at Job I. and x = The number of hours per week Niki will work at Job II. If she makes $40 an hour at Job I, and $30 an hour at Job II, what are the linear constraints to maximize her income?arrow_forwardThe marching band at a local high school is selling candy bars. The profits will go toward the purchase of new marching band uniforms. They are interested in knowing what price they should charge to obtain the maximum profit. The candy bars are donated by a local retailer so they know that if they charge $0 they will make $0 profit. They also collect data from other marching bands who have sold candy bars in the past. The data they collected is shown in the table below. Price 0.00 0.45 0.60 0.75 1.00 1.25 1.40 1.50 Profit 0.00 $720 $900 $990 $845 $625 $560 $300 What factors might influence how much is to be made from the candy sale? Give at least two. What happens to the profit as the price of each candy bar increases Explain possible reasons for your observations. How do you suppose the other bands determined the price at which to sell each candy bar? Do any data values seem unusual? Yes or No (circle one) Why? Which…arrow_forward
arrow_back_ios
arrow_forward_ios
Recommended textbooks for you
- Elementary Geometry For College Students, 7eGeometryISBN:9781337614085Author:Alexander, Daniel C.; Koeberlein, Geralyn M.Publisher:Cengage,Glencoe Algebra 1, Student Edition, 9780079039897...AlgebraISBN:9780079039897Author:CarterPublisher:McGraw HillAlgebra: Structure And Method, Book 1AlgebraISBN:9780395977224Author:Richard G. Brown, Mary P. Dolciani, Robert H. Sorgenfrey, William L. ColePublisher:McDougal Littell
Elementary Geometry For College Students, 7e
Geometry
ISBN:9781337614085
Author:Alexander, Daniel C.; Koeberlein, Geralyn M.
Publisher:Cengage,
Glencoe Algebra 1, Student Edition, 9780079039897...
Algebra
ISBN:9780079039897
Author:Carter
Publisher:McGraw Hill
Algebra: Structure And Method, Book 1
Algebra
ISBN:9780395977224
Author:Richard G. Brown, Mary P. Dolciani, Robert H. Sorgenfrey, William L. Cole
Publisher:McDougal Littell
Matrix Factorization - Numberphile; Author: Numberphile;https://www.youtube.com/watch?v=wTUSz-HSaBg;License: Standard YouTube License, CC-BY