Concept explainers
1.
Calculate the amount that Company O must capitalize for the milling machine as of December 31, 2016.
1.

Explanation of Solution
Cost of self-constructed assets:
Company sometimes constructs an item of “property, plant and equipment” which is used in the business operations and these are known as self-constructed assets. The cost of self-constructed assets comprises of expenses that are required to build an asset and put it in operating condition.
Particulars | Amount ($) | Amount ($) |
Raw materials: | ||
Iron castings | 61,040 | |
Other raw materials. | 50,200 | $111,240 |
Direct labor: | ||
Layout (1) | $450 | |
Electricians (2) | 2,700 | |
Machinery (3) | 7,200 | |
Heat treatment (4) | 750 | |
Assembly (5) | 2,450 | |
Testing (6) | 1,280 | |
Additional testing labor (7) | 800 | 15,630 |
Factory | ||
Layout and electricians (8) | $2,205 | |
Machining, heat treatment, assembly, testing (9) | ||
12,480 | 14,685 | |
Interest paid | 4,260 | |
Total amount to be capitalized | 145,815 |
Table (1)
Working notes:
(1)Calculate the amount of direct labor costs for layout:
(2)Calculate the amount of direct labor costs for electricians:
(3)Calculate the amount of direct labor costs for machinery:
(4)Calculate the amount of direct labor costs for Heat treatment:
(5)Calculate the amount of direct labor costs for assembly:
(6)Calculate the amount of direct labor costs for testing:
(7)Calculate the amount of direct labor costs for additional testing labor:
(8)Calculate the factory overhead for layout and electricians:
(9)Calculate the factory overhead for machinery, heat treatment, assembly and testing:
2.
Ascertain the costs included in requirement 1 for which there are acceptable alternative procedures and explain the alternative procedures for each case.
2.

Explanation of Solution
“Alternate procedures are probable for two costs— factory overhead and rework costs (affects direct labor, repairs and maintenance, and factory overhead)”
- Rework costs must be taken as cost for the period in which they are nonstandard. Rework costs rising from errors that must not have incurred should be considered as losses of the period. Seemingly, this was the case in this condition since the impairment resulted from a type of error that is not expected. Accordingly, related repairs, maintenance expenses and rework costs are not capitalized in requirement 1.
- Two alternative ways are there to allocate overhead costs to self-constructed assets. The method followed in “requirement 1” is to allot a portion of all overhead costs to the self-constructed asset. The reason which justifies this particular treatment is that all productive output must absorb its proportionate share of all factory overhead costs. Additionally, this method result in a cost of the constructed asset that approximates the cost of the equivalent asset acquired.
- Capitalizing the incremental overhead, that is traceable fixed and variable overhead is the second method that increases as a result of construction. Additional costs occurred in production of the fixed asset (part of the assets’ cost) are included in this method. Traceable fixed overhead and variable overhead are occurred to build the asset and it will be advantageous in the upcoming periods therefore, these costs must be capitalized.
- If there is no relationship between the self-constructed asset and fixed overhead costs, non-traceable fixed overhead costs will be incurred so, these costs must not be capitalized.
Want to see more full solutions like this?
Chapter 10 Solutions
Intermediate Accounting: Reporting and Analysis (Looseleaf)
- hi expert please help mearrow_forwardStandard Quantity Puvo, Inc., manufactures a single product in which variable manufacturing overhead is assigned on the basis of standard direct labor-hours. The company uses a standard cost system and has established the following standards for one unit of product: Standard Price or Rate Standard Cost Direct materials 5.90 pounds $0.70 per pound $4.13 Direct labor 0.50 hours $34.50 per hour $ 17.25 Variable manufacturing 0.50 hours $8.60 per hour $ 4.30 overhead During March, the following activity was recorded by the company: -The company produced 2,500 units during the month. -A total of 19,500 pounds of material were purchased at a cost of $13,680. -There was no beginning inventory of materials on hand to start the month; at the end of the month, 3,720 pounds of material remained in the warehouse. -During March, 1,100 direct labor-hours were worked at a rate of $31.50 per hour. -Variable manufacturing overhead costs during March totaled $14,161. -The direct materials purchases…arrow_forwardaccountarrow_forward
- Information for Southgate Company's direct labor costs for the month of March 2021 was as follows: Actual direct labor hours: 42,000 hours Standard direct labor hours: 40,000 hours Total direct labor payroll: $315,000 Direct labor efficiency variance: unfavorable $5,000 What is Southgate's direct labor price (or rate) variance?arrow_forwardwhat is Sophia's return on equity?arrow_forwardHi expert please give me answer general accounting questionarrow_forward
- I want to correct answer general accounting questionarrow_forwardOn January 1, Silverstone Co. issues bonds with a face value of $400,000 and an interest rate of 8%, payable semi-annually. What is the amount of interest expense on July 1?arrow_forwardHow much long term debt does omega solutions have of this financial accounting question?arrow_forward
- Intermediate Accounting: Reporting And AnalysisAccountingISBN:9781337788281Author:James M. Wahlen, Jefferson P. Jones, Donald PagachPublisher:Cengage Learning