Zepol Company is planning to produce 600,000 power drills for the coming year. The company uses direct labor hours to assign overhead to products. Each drill requires 0.75 standard hour of labor for completion. The total budgeted overhead was $1,777,500. The total fixed overhead budgeted for the coming year is $832,500. Predetermined overhead rates are calculated using expected production, measured in direct labor hours. Actual results for the year are: Actual production (units) 594,000 Actual variable overhead $928,000 Actual direct labor hours (AH) 446,000 Actual fixed overhead $835,600 Required: 1. Compute the applied variable overhead. $fill in the blank 6 2. Compute the applied fixed overhead. $fill in the blank 1 3. Compute the fixed overhead spending and volume variances. Enter amounts as positive numbers and select Favorable or Unfavorable. Spending variance $fill in the blank 2 Unfavorable Volume variance $fill in the blank 4 Unfavorable
Variance Analysis
In layman's terms, variance analysis is an analysis of a difference between planned and actual behavior. Variance analysis is mainly used by the companies to maintain a control over a business. After analyzing differences, companies find the reasons for the variance so that the necessary steps should be taken to correct that variance.
Standard Costing
The standard cost system is the expected cost per unit product manufactured and it helps in estimating the deviations and controlling them as well as fixing the selling price of the product. For example, it helps to plan the cost for the coming year on the various expenses.
Zepol Company is planning to produce 600,000 power drills for the coming year. The company uses direct labor hours to assign
Actual production (units) | 594,000 | Actual variable overhead | $928,000 | |||
Actual direct labor hours (AH) | 446,000 | Actual fixed overhead | $835,600 |
Required:
1. Compute the applied variable overhead.
$fill in the blank 6
2. Compute the applied fixed overhead.
$fill in the blank 1
3. Compute the fixed overhead spending and volume variances. Enter amounts as positive numbers and select Favorable or Unfavorable.
Spending variance | $fill in the blank 2 | Unfavorable | |
Volume variance | $fill in the blank 4 | Unfavorable |