EBK STRUCTURAL ANALYSIS
EBK STRUCTURAL ANALYSIS
6th Edition
ISBN: 9780357030974
Author: KASSIMALI
Publisher: VST
Question
Book Icon
Chapter 10, Problem 1P
To determine

Find the symmetric and antisymmetric loading component.

Expert Solution & Answer
Check Mark

Explanation of Solution

Given information:

The structure is given in the Figure.

The Young’s modulus E and the area A is constant.

Calculation:

Refer the given structure.

Divide the magnitudes of forces and moments of the given loading by 2 to obtain the half loading.

Sketch the half loading for the given structure as shown in Figure 1.

EBK STRUCTURAL ANALYSIS, Chapter 10, Problem 1P , additional homework tip  1

Draw the reflection of half loading about the specified axis S.

Sketch the reflection of half loading as shown in Figure 2.

EBK STRUCTURAL ANALYSIS, Chapter 10, Problem 1P , additional homework tip  2

Add the half loading (Figure 1) and reflection of half loading (Figure 2) to find the symmetric component.

Sketch the symmetric loading component as shown in Figure 3.

EBK STRUCTURAL ANALYSIS, Chapter 10, Problem 1P , additional homework tip  3

Subtract the symmetric loading component (Figure 3) from the given loading to obtain the antisymmetric loading component.

Sketch the antisymmetric loading component as shown in Figure 4.

EBK STRUCTURAL ANALYSIS, Chapter 10, Problem 1P , additional homework tip  4

Want to see more full solutions like this?

Subscribe now to access step-by-step solutions to millions of textbook problems written by subject matter experts!
Students have asked these similar questions
4.5m 4.5m 4.5m 20 4m A- Intermediate flat plate floor, story height=2.75 m, t=190 mm, f'c=20 MPa for slabs and f'c=35 MPa for columns. All columns are 400×400mm. Find all DF for the interior equivalent frame shown. 6m 6m
2. Determine the reactions, and shear and moment diagrams. EI= 50000 kip-ft2[50pts] Note: You can use the virtual work method/ Table to calculate fij terms. A 18 ft B 40 k 6 ft C
based on the gantt chart shown what is the most appropriate next step to prevent project delay? A) Shift  non-critical tasks to make room for Task B B) Reassign the graming worrk to a different subcontractor immediately. C) Extend the project deadline by one week  D)Analyze float in adjacent task and consider crashing task B
Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
  • Text book image
    Structural Analysis
    Civil Engineering
    ISBN:9781337630931
    Author:KASSIMALI, Aslam.
    Publisher:Cengage,
Text book image
Structural Analysis
Civil Engineering
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:Cengage,