Question
Chapter 1, Problem 7RQ
To determine
The cost per unit volume.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
If the construction cost of a bungalow of size 34’6" (10.5 m) × 40'9" (12.4 m) was $120,790.00, what is the cost per square foot (square meter)?
please send a handwritten solution
Q:
(i) Which type of place should be best for constructing a hospital.
(ii) Which type of material (e.g wood, aluminum, steel etc) should be used for constructing doors, windows and ventilators in the hospital. Also give the reason behind your decision.
Chapter 1 Solutions
Fundamentals of Construction Estimating
Knowledge Booster
Similar questions
- You want a mountain cabin built for weekend trips, vacations, to host family, and perhaps eventually to retire in. After discussing the project with a local contractor, you receive an estimate that the total con- struction cost of your 2000-ft2 lodge will be $250,000. The percentage of costs is broken down as follows: Percentage of Cost Items Total Costs Construction permits, legal and 8 title fees Roadway, site clearing, preparation Foundation, concrete, masonry Wallboard, flooring, carpentry Heating, ventilation, air conditioning (HVAC) Electric, plumbing, communications Roofing, flooring Painting, finishing 15 13 12 13 10 12 17 100 (a) What is the cost per square foot of the 2000-ft2 lodge? (b) If you are also considering a 4000-ft² layout option, estimate your construction costs if: i. All cost items (in the table) change propor- tionately to the size increase. ii. The first two cost items do not change at all; HVAC changes by 50%; and all others are proportionate.arrow_forwardThe preliminary cost for a 51,000 ft2 aircraft hangar must be estimated. The first unit estimate was $101 per square foot. Estimate the cost of the hangar. The cost of the hangar is determined to be $ .arrow_forwardYou are a licensed Civil Engineer. Your brother prepared a drawing plan and structural design for one of his projects. However, since he is not yet a Licensed CE, he requested you for your approval and signature of the same, offering you a certain amount as payment. Will you give your approval/signature for the said plan and design? Why?arrow_forward
- If you will construct your own house, what modern technology construction method are you going to apply? Why?arrow_forwardWhat is Total Installed Cost?arrow_forwardOne plumbing job requires 45 meters of PVC pipe, and a second job requires 30 meters. The pipe comes in 6-meter lengths only. How many sections should the plumber buy? How much pipe will be left over, assuming that there are no errors?arrow_forward
- Give two classifications of building according to mass classification (mass content).arrow_forwardWould you like a report on a house built with natural materials?arrow_forwardA heating supply store buys 6-inch metal flue pipe at $2.90 per 24-inchsection. The pipe is marked up 40%. What is the selling price of one section?arrow_forward
- This assignment consists of determining the quantities for a cost estimate in different units. Assume a rectangular warehouse with internal measurements of 22' wide, 34’long and 12' high. The warehouse has (including the frame): One 6' wide and 5' high window on all walls. A 6' wide and 8' high door in the front wall. Walls: 6” block (above floor) Concrete: thickness of ceiling = 5” and floor = 4” Assume 4 14” x 14” columns (1 column at each corner of warehouse) and one beam throughout perimeter below ceiling 14" wide and 20" high. The 4” concrete floor has a 6” wide by 12” high perimeter beam. The column footing will be counted 2'-6" from the top of the floor. Square footing size is 6'-0" x 6'-0" by 12" thick. Make a drawing with your best interpretationarrow_forwardIdentify four good sources of price information about construction materialsarrow_forwardInterpret the objectives of life-cycle costing and discuss the importance of determining building’s life-cycle costs. In your own understanding and make it short.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Fundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,Architectural Drafting and Design (MindTap Course...Civil EngineeringISBN:9781285165738Author:Alan Jefferis, David A. Madsen, David P. MadsenPublisher:Cengage Learning
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,
Architectural Drafting and Design (MindTap Course...
Civil Engineering
ISBN:9781285165738
Author:Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:Cengage Learning