Question
thumb_up100%
Chapter 1, Problem 36R
a.
To determine
Whether the use of stepladder without fully locked is a safe practice or not.
b.
To determine
Who is responsible for ladder collapse fault.
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
What follows is a numeric fill in the blank question with 3 blanks.
Figure 1 shows the three phases V-t graph in Turkey. Please write the indicated values with their units in boxes and Voltage - time function of each phase in table below. Please write the units in the second box.
1= _______________ V
2= ________________ms
3= _______________ms
Grounding Lighting Fixtures. There are specific requirements for grounding lighting fixtures. How must they be grounded and with what size conductors? Be sure and cite the code in your answers.
The control circuit is used to detect and count the number of products being carried on an assembly line. When it counts five products, the circuit energizes a solenoid. The solenoid is energized for a period of two seconds and is then shunts off, causing it to retract?
Note: Correct and detailed answer will be Upvoted else downvoted. Thank you!
Chapter 1 Solutions
Electrical Wiring: Residental - With Plans (Paperback) Package
Ch. 1 - What is the purpose of specifications?Ch. 1 - Refer to the specifications in the back of this...Ch. 1 - What is done to prevent a plan from becoming...Ch. 1 - Name three requirements contained in the...Ch. 1 - Prob. 5RCh. 1 - What phrase is used when a substitution is...Ch. 1 - What is the purpose of an electrical symbol?...Ch. 1 - Prob. 8RCh. 1 - Prob. 9RCh. 1 - What three parties must be satisfied with the...
Ch. 1 - Prob. 12RCh. 1 - Prob. 13RCh. 1 - Does the NEC provide minimum or maximum standards?...Ch. 1 - What do the letters UL signify?Ch. 1 - What section of the NEC states that all listed or...Ch. 1 - Prob. 17RCh. 1 - Prob. 18RCh. 1 - Does compliance with the NEC always result in an...Ch. 1 - Name two nationally recognized testing...Ch. 1 - Prob. 21RCh. 1 - Prob. 23RCh. 1 - A junction box on a piece of European equipment is...Ch. 1 - Prob. 25RCh. 1 - You will learn in Chapter 3 that residential...Ch. 1 - Prob. 27RCh. 1 - What can you do to reduce or eliminate the...Ch. 1 - What is the NEC definition of a qualified person?Ch. 1 - Are low-voltage systems totally safe? Explain.Ch. 1 - Prob. 32RCh. 1 - What do the letters PPE stand for?...Ch. 1 - Prob. 34RCh. 1 - Where might you obtain information about...Ch. 1 - Prob. 36R
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.Similar questions
- (b) An employee is working on a ladder and the ladder seems to collapse. The employee falls off the ladder and breaks arm. The investigation reveals the following details: • Employee had worked seven 12-hour shifts in a row. • Accident happened at end of shift. • Employee was standing on the top step of the ladder (an unsafe action). The employee was approximately 10 feet above floor level. No fall arrest or restraint system was used. • A ladder inspection policy is in place, but there is no evidence that the ladder has ever been inspected. Investigation reveals the ladder was damaged and did not provide a stable working platform in any environment. • Interview with the facility manager reveals that he did not inspect the ladder when it was due for inspection. He was aware that the ladder needed to be inspected. (i) Examine either accident investigation is required or not. (ii) Discover SIX (6) factors and possible causes affecting the incidences. (iii) Explain the root cause of the…arrow_forwardAn open in one of the heated rear window grid elements can be repaired by ______. a. pealing the heat grid off the glass with a heat gun and installing a new grid element b. applying a thin strip of a repair compound to the damaged area c. bridging the damaged area with rosin core solder d. replacing the window glassarrow_forward1.1 PV modules can be wired together in an array using ______ connections to increase voltage. a. Terminating b. Series c. Parallel d. AC 1.2 A PV module, also called a solar panel, is comprised of individual photovoltaic _______ wired and mounted together as an integrated unit. a. Capsules b. Compartments c. Chips d. Cells 1.3 A __________ system uses a storage system that stores the generated electricity so it can provide during times when the system’s panels are not receiving solar energy. a. Direct coupled b. Self regulating c. Charge controlled d. Indirectly connected 1. 4 __________ energy may have the potential to supply all of the world's energy needs, but at this time, it provides a very small percentage. a. Coal b. Natural Gas c. Diesel d. Solararrow_forward
- 3.a. When a device is removed from an outlet box, the_______ wire must be connected in such a way that maintains continuity. A. neutral B. grounding C. hot D. grounded neutral 3. To correctly saw a lath and plaster wall, point the teeth of the saw A. away from you and cut on the pushing stroke. B. away from you and cut on the pulling stroke. C. toward you and cut on the pushing stroke. D. toward you and cut on the pulling stroke.arrow_forwardQUESTION 9 When a ground wire is connected to an interior gas piping system and the underground portion of the gas pipe into the building is plastic, which of the following is (or are) true? a A.This would be approved by code as the gas pipe is only being bonded to the electrical system. b B.This installation would be approved by code, as the gas pipe is not a grounding electrode. c C.Both A and B d D.Neither A nor Barrow_forward14: In a natural circulation solar water heater, collector has a glass cover on the top and an ________________ material at the bottom. a. Insulating b. Sheets c. Steel d. Tubes 15: text ____________ wind mill consists of narrow rims and wire spokes. a. Single bladed b. Vertical Axis c. Double bladed d. Multibladedarrow_forward
- An emergency system shall have adequate capacity and rating for _______ to be operated simultaneously A. 80% of the loads B. All loads C. 125% of the loads D. None of these answersarrow_forwardof p o How many conductors enter the ceiling fan/light wall box? Switch ond out let boxes s tirst 10. What type and size of box may be used for the ceiling fan/light wall box?. 11. What type of covers are used with 4 in. square outlet boxes? 12. a. Does the circuit for the Master Bedroom have a grounded circuit conductor? b. Does it have an equipment grounding conductor? c. Explain the difference between a "grounded" conductor and an "equipment grounding" conductor. 13. Approximately how many feet (meters) of 2-wire cable and 3-wire cable are needed to ft complete the circuit supplying the Master Bedroom? Two-wire cable: ft (- m). m). Three-wire cable: 14. If the cable is laid in notches in the corner studs, what protection for the cable must be provided? 15. How high are the receptacles mounted above the finished floor in this bedroom? 16. Approximately how far from the bedroom door is the first receptacle mounted? (See the plans.) 17. What is the distance from the finished floor to…arrow_forward4.a. The ___ calculated load is rarely placed on an electrical system.A. optionalB. standardC. total 4.b. What's the primary disadvantage of using copper conductors?A. CostB. AvailabilityC. Weight 4.c. You're evaluating the components of a multioccupancy building that won't have an on-site employee. Tobe compliant with the NEC, each occupant will need to have access to their ownA. service-disconnecting means.B. service conductor.C. cable attachment point.D. emergency fire water-pump disconnect.arrow_forward
- 6. Ferrous metal raceways or enclosures are made with _______ content.A. brass or aluminumB. steel or brassC. aluminum or ironD. iron or steelarrow_forwardQ34 Provide answers for the following: a) Differentiate between Planned preventive maintenance and condition based maintenance. b) List the condition monitoring tests used for: i. Circuit breakers ii. iv. Transformers Cables, and Busbars (need two examples for each category).arrow_forwardMessages AA Statement one Training will allow you to safely erect a mobile. tower scaffold on any ground surface condition. and access the tower both internal and externally Statement two In windy conditions placing sheeting around the mobile tower scaffold will protect the workers on the tower a) Statement two is incorrect b) Statement one and two are correct c) Statement one is correct and statement two is incorrect d) Both statements are incorrect actclass.co.uk 22 Questi 23 Questi 24 Questi 25 Questi 26 Questi Submit Answers Ćarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- EBK ELECTRICAL WIRING RESIDENTIALElectrical EngineeringISBN:9781337516549Author:SimmonsPublisher:CENGAGE LEARNING - CONSIGNMENT
EBK ELECTRICAL WIRING RESIDENTIAL
Electrical Engineering
ISBN:9781337516549
Author:Simmons
Publisher:CENGAGE LEARNING - CONSIGNMENT
Introduction to 8051 Microcontroller | Part 1 | Bharat Acharya Education; Author: Bharat Acharya Education;https://www.youtube.com/watch?v=2-geyR_aM28;License: Standard Youtube License