To determine

Explain the reason for classifying the freeway with a ramp metering system as a system with a feedback.

Sketch a flowchart similar to that of Figure 1.11 and label the lines and boxes with terms applicable to access the control of a freeway.

Expert Solution & Answer
Check Mark

Explanation of Solution

Ramp metering system:

  1. 1. The ramp metering system is used to regulate the volume of traffic that enters the freeways, depending upon the current traffic conditions.
  2. 2. The usage of this system reduces the traffic congestion and improves the safety of the driver.
  3. 3. The ramp metering system has two signals namely red and green signals.

The classification of this system as a system with a feedback relies on the fact that the system has significant input and output with a positive consequence (feedback) over the environment.

For example, the output of the ramp metering system are less traffic congestion, reduced pollution, and increased driver safety. These outputs show that the feedback is positive and also the system is most suited to the environment.

Sketch the flowchart for the ramp metering system as shown in Figure 1.

EBK INTRODUCTION TO SUSTAINABLE CIVIL E, Chapter 1, Problem 2EDDS

Want to see more full solutions like this?

Subscribe now to access step-by-step solutions to millions of textbook problems written by subject matter experts!
Students have asked these similar questions
can you help me figure out the calculations so that i can input into autocad?  Not apart of a graded assinment. Just a problem in class that i missed.
Use method of joints to determine forces in all members (all distances are in mm) Find the resultant force at the pin support and state its angle of inclination
For Problem 7.2, calculate the optimal cycle length (Webster’s formulation) and the corresponding effective green times (based on lane group v/c equalization). Assume lost time is 4 seconds per timing stage.
Knowledge Booster
Background pattern image
Civil Engineering
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning
Text book image
Residential Construction Academy: House Wiring (M...
Civil Engineering
ISBN:9781285852225
Author:Gregory W Fletcher
Publisher:Cengage Learning