You have been asked to evaluate two alternatives, X and Y, that may increase plant capacity for manufacturing high-pressure hydraulic hoses. The parameters associated with each alternative have been estimated. Which one should be selected on the basis of a present worth comparison at an interest rate of 12% per year? Why is yours the correct choice? Alternative First Cost Maintenance cost, per Year Salvage Value Life X $-40,000 $-14000 $1,500 5 years The present worth of alternative Y, (in $) Round off to the nearest two (2) decimal places, include sign Add your answer Y $-65,000 $-5000 $7,500 5 years

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question

2. Solve the given question and give the correct answer.

 

You have been asked to evaluate two alternatives, X and Y, that may increase plant capacity for manufacturing high-pressure
hydraulic hoses. The parameters associated with each alternative have been estimated. Which one should be selected on the basis
of a present worth comparison at an interest rate of 12% per year? Why is yours the correct choice?
Alternative
First Cost
Maintenance cost, per Year
Salvage Value
Life
X
Add your answer
$-40,000
$-14000
$1,500
5 years
The present worth of alternative Y, (in $)
Round off to the nearest two (2) decimal places, include sign
Y
$-65,000
$-5000
$7,500
5 years
Transcribed Image Text:You have been asked to evaluate two alternatives, X and Y, that may increase plant capacity for manufacturing high-pressure hydraulic hoses. The parameters associated with each alternative have been estimated. Which one should be selected on the basis of a present worth comparison at an interest rate of 12% per year? Why is yours the correct choice? Alternative First Cost Maintenance cost, per Year Salvage Value Life X Add your answer $-40,000 $-14000 $1,500 5 years The present worth of alternative Y, (in $) Round off to the nearest two (2) decimal places, include sign Y $-65,000 $-5000 $7,500 5 years
Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Knowledge Booster
Time value of money
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning