You are the geotechnical engineer for a proposed office building in a densely clustered city. The office building will be constructed adjacent to an existing office complex. The soil at the site is a deposit of very dense sand with E = E’= 45 MPa and v = v’ = 0.3. The sand rests on a deep deposit of dense gravel. The existing high-rise complex is founded on a concrete slab, 100 m 3 120 m, located at 2 m below ground surface, and transmits a load of 2400 MN to the soil. Your office foundation is 50m x 80m and transmits a load of 1000 MN. You also intend to locate your foundation at 2m below ground level. The front of your building is aligned with the existing offi ce complex, and the side distance is 0.5 m. The lesser dimension of each building is the frontal dimension. The owners of the existing building are concerned about possible settlement of their building due to your building. You are invited to a meeting with your client, the owners of the existing building, and their technical staff. You are expected to determine what effects your offi ce building would have on the existing building. You only have one hour to make the preliminary calculations. You are expected to present the estimated increase in stresses of the existing office complex will due to the construction of your office building. Prepare your analysis, calculation and presentation.
You are the
Trending now
This is a popular solution!
Step by step
Solved in 5 steps with 1 images