White & Becker Tools (W&B) requires 2,000 electric motors next month for its product li motor is composed of three components: a coil, a shaft, and housing. W&B has the c components or purchase them from an outside vendor. The costs of producing them and p in the following table.
White & Becker Tools (W&B) requires 2,000 electric motors next month for its product li motor is composed of three components: a coil, a shaft, and housing. W&B has the c components or purchase them from an outside vendor. The costs of producing them and p in the following table.
Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
Related questions
Question

Transcribed Image Text:Problem-3:
White & Becker Tools (W&B) requires 2,000 electric motors next month for its product line of weed trimmers. Each
motor is composed of three components: a coil, a shaft, and housing. W&B has the capability to produce these
components or purchase them from an outside vendor. The costs of producing them and purchasing them are shown
in the following table.
COMPONENT
Coil
Shaft
Housing
PRODUCTION
COST PER UNIT
Fabrication 0.5
0.4
Molding
Inspection
0.2
$2.60
$1.80
$1.40
The components that are produced by W&B must pass through three departments: fabrication, molding, and
inspection. The number of hours each component requires in each department and the total number of hours available
next month in each department are shown in the following table:
0.2
0.7
PURCHASE
COST PER UNIT
DEPART- COIL SHAFT HOUSING AVAILABILITY
MENT
(HR.) (HR.)
(HR.)
(HR.)
$3.12
$2.16
$1.68
0.6
0.3
0.4
3,000
3,000
1,800
In order to determine the number of components that will be produced and the number that will be purchased, W&B
has set the following goals, in rank order:
Rank 1: The total costs to produce and purchase components next month should not exceed $14,000.
Rank 2: Idle time in the fabrication department should be minimized.
Rank 3: At least 200 coils should be purchased from the vendor next month.
Determine the number of components produced and purchased next month, according to these ranked goals.
Expert Solution

This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 4 steps with 10 images

Recommended textbooks for you

Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,

Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education

Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education

Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,

Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education

Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education


Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning

Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.