what is the value for the missing variable System description: A reservoir with a surface area of 200,000 square meters is fed by a single stream and discharges through a single outflow structure. During a 30 day period 90.0 mm of rain fell on the reservoir. The average evaporation rate during this period was 1.5 mm per day, and the total outflow from the control structure of the reservoir was 180,000 cubic meters. All other inputs and outputs were negligible. The reservoir volume started at 120,000 cubic meters of water, and at the end of the 30 day period had reached 130,000 cubic meters.

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
100%
what is the value for the missing variable
System description:
A reservoir with a surface area of 200,000
square meters is fed by a single stream and
discharges through a single outflow structure.
During a 30 day period 90.0 mm of rain fell on
the reservoir. The average evaporation rate
during this period was 1.5 mm per day, and the
total outflow from the control structure of the
reservoir was 180,000 cubic meters. All other
inputs and outputs were negligible. The
reservoir volume started at 120,000 cubic
meters of water, and at the end of the 30 day
period had reached 130,000 cubic meters.
Units: for volume use cubic meters (m³)
and for time use days.
Transcribed Image Text:what is the value for the missing variable System description: A reservoir with a surface area of 200,000 square meters is fed by a single stream and discharges through a single outflow structure. During a 30 day period 90.0 mm of rain fell on the reservoir. The average evaporation rate during this period was 1.5 mm per day, and the total outflow from the control structure of the reservoir was 180,000 cubic meters. All other inputs and outputs were negligible. The reservoir volume started at 120,000 cubic meters of water, and at the end of the 30 day period had reached 130,000 cubic meters. Units: for volume use cubic meters (m³) and for time use days.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps

Blurred answer
Similar questions
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning