What is the net water budget for a region where the annual rainfall is 890 mm and the potential evaporation is 635 mm? 2. On an annual basis, the potential precipitation in a watershed is 1,776 mm, the actual evapotranspiration is 914 mm, and 64 percent of the surplus precipitation is runoff. What is the percentage of each component of the watershed? 3. A watershed has an area of 9.84 x 102 km2 in a region where the annual surface runoff is 305 mm
Unitary Method
The word “unitary” comes from the word “unit”, which means a single and complete entity. In this method, we find the value of a unit product from the given number of products, and then we solve for the other number of products.
Speed, Time, and Distance
Imagine you and 3 of your friends are planning to go to the playground at 6 in the evening. Your house is one mile away from the playground and one of your friends named Jim must start at 5 pm to reach the playground by walk. The other two friends are 3 miles away.
Profit and Loss
The amount earned or lost on the sale of one or more items is referred to as the profit or loss on that item.
Units and Measurements
Measurements and comparisons are the foundation of science and engineering. We, therefore, need rules that tell us how things are measured and compared. For these measurements and comparisons, we perform certain experiments, and we will need the experiments to set up the devices.
What is the net water budget for a region where the annual rainfall is 890 mm and the potential evaporation is 635 mm? 2. On an annual basis, the potential precipitation in a watershed is 1,776 mm, the actual evapotranspiration is 914 mm, and 64 percent of the surplus precipitation is runoff. What is the percentage of each component of the watershed? 3. A watershed has an area of 9.84 x 102 km2 in a region where the annual surface runoff is 305 mm
Trending now
This is a popular solution!
Step by step
Solved in 3 steps