What enabling technologies were/are required to make this new technology possible like hydro power?
Synchronous Generator
In comparison to an asynchronous generator, it is a machine where the rotor speed is equal to the rotating magnetic field produced by the stator, i.e., mechanical speed is equal to the electrical speed, thus called synchronous, and not asynchronous.
Salient Pole Rotor
Salient pole rotor includes a large number of exposed poles mounted on a magnetic wheel. The construction of a bright pole is as shown in the image on the left. The proposed poles are made of metal laminations. The rotor winding is provided on these poles and is supported by pole shoes.
What enabling technologies were/are required to make this new technology possible like hydro power?
Some new technologies which required to make this new technology possible like hydro power are:
Hydropower flexibility:
Environmental change alleviation systems require a high portion of sustainable power sources (RES). The variable age of RES requires that new hydro power advances give more prominent adaptability over a drawn out scope of pressure driven conditions.
The absolute most notable adaptability advancements a work in progress are: stabilizer blades, a movable stomach introduced in the draft tube cone, J-grooves, air infusion/confirmation, hub water infusion with high/low speed and low/high release, distracting water infusion at a cone divider, hub water infusion with a counter-stream extraneous part, ejector power plants for the overabundance stream rate, two-stage air-water infusion along the pivot, hydroelectric energy stockpiling arrangements, battery half and halves, and savvy demonstrating and control answers for increment unit adaptability and working reach.
Hydropower digitalization:
The assortment and preparing of certifiable information to change the genuine working states of hydropower turbines can give progressed framework supporting administrations without undermining stations' dependability and wellbeing. It is assessed that a complete 42 TWh could be added to introduce hydropower energy creation by carrying out hydropower digitalization. Such an expansion could prompt yearly functional reserve funds of USD 5 billion and a critical decrease of ozone depleting substance outflows.
Energy storage and variable speed turbines:
Determined to repay the increment of variable RES in power frameworks, energy stockpiling, for example, that gave by Pumped hydropower storage (PHS) is required. PHS plants work both in turbine and in siphon mode for topping guideline, which can be upgraded by fixed or variable speed turbines.
Step by step
Solved in 2 steps