Vaquero Vaquera Cutting hours 2,000 5,400 Assembly hours 2,900 4,650 Inspection hours 525 2,430 Rework hours 100 450 The following activity data have been collected: Cutting $177,600 Assembling $339,750 Inspecting $47,280 Reworking $33,000 Required: Calculate the activity rates that would be used to assign costs to each product. If required, round your answers to the nearest cent.
Process Costing
Process costing is a sort of operation costing which is employed to determine the value of a product at each process or stage of producing process, applicable where goods produced from a series of continuous operations or procedure.
Job Costing
Job costing is adhesive costs of each and every job involved in the production processes. It is an accounting measure. It is a method which determines the cost of specific jobs, which are performed according to the consumer’s specifications. Job costing is possible only in businesses where the production is done as per the customer’s requirement. For example, some customers order to manufacture furniture as per their needs.
ABC Costing
Cost Accounting is a form of managerial accounting that helps the company in assessing the total variable cost so as to compute the cost of production. Cost accounting is generally used by the management so as to ensure better decision-making. In comparison to financial accounting, cost accounting has to follow a set standard ad can be used flexibly by the management as per their needs. The types of Cost Accounting include – Lean Accounting, Standard Costing, Marginal Costing and Activity Based Costing.
Activity Rates
Zapato Company produces two types of boots: vaquero and vaquera. There are four activities associated with the two products. Drivers for the four activities are as follows:
Vaquero | Vaquera | |||
Cutting hours | 2,000 | 5,400 | ||
Assembly hours | 2,900 | 4,650 | ||
Inspection hours | 525 | 2,430 | ||
Rework hours | 100 | 450 |
The following activity data have been collected:
Cutting | $177,600 |
Assembling | $339,750 |
Inspecting | $47,280 |
Reworking | $33,000 |
Required:
Calculate the activity rates that would be used to assign costs to each product. If required, round your answers to the nearest cent.
Cutting: | $fill in the blank 1 per cutting hour |
Assembling: | $fill in the blank 2 per assembling hour |
Inspecting: | $fill in the blank 3 per inspecting hour |
Reworking: | $fill in the blank 4 per reworking hour |
Trending now
This is a popular solution!
Step by step
Solved in 3 steps