TRUE OR FALSE a, A cost that is traceable to a segment through activity-based costing is always an avoidable cost for decision making. b. One way to increase the effective utilization of a bottleneck is to reduce the number of defective units. c. Two or more products that are produced from a common input are known as joint products.
TRUE OR FALSE
a, A cost that is traceable to a segment through activity-based costing is always an avoidable cost for decision making.
b. One way to increase the effective utilization of a bottleneck is to reduce the number of defective units.
c. Two or more products that are produced from a common input are known as joint products.
d. If the salvage value of equipment at the end of a project is highly uncertain, the salvage value should be ignored in capital budgeting decisions.
-
e. A cost that is traceable to a segment through activity-based costing is always an avoidable cost for decision making.
f. Eliminating nonproductive processing time is particularly important in a bottleneck operation.
g. In a decision to drop a product, the product should be charged for rent in proportion to the space it occupies even if the space has no alternative use and the rental payment is unavoidable.