Toolco operates a machine shop with 22 machines. On the average, a machine breaks down every 2 hours. It takes an average of 12 minutes to complete a repair. When a machine breaks down, one of four repairpersons is called upon to do the repair. Both the time between breakdowns and the repair time are exponential Toolco is interested in analyzing this situation and knowing the number of repairpersons needed to keep the shop running "smoothly." A=%2=0.5 breaks down per hour μ = 60/12 = 5 breaks down per hour System limit = K = 22 machines Source limit= K = 22 machines R=1, 2, 3, 4. (M/M/R: GD/K /K),

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
icon
Related questions
Question
Toolco operates a machine shop with 22 machines. On the
average, a machine breaks down every 2 hours. It takes an
average of 12 minutes to complete a repair. When a machine
breaks down, one of four repairpersons is called upon to do the
repair. Both the time between breakdowns and the repair time are
exponential. Toolco is interested in analyzing this situation and
knowing the number of repairpersons needed to keep the shop
running "smoothly."
A = 12 = 0.5 breaks down per hour
μ = 60/12 = 5 breaks down per hour
System limit = K = 22 machines
Source limit= K = 22 machines
R = 1, 2, 3, 4.
(M/M/R: GD/ K /K),
Transcribed Image Text:Toolco operates a machine shop with 22 machines. On the average, a machine breaks down every 2 hours. It takes an average of 12 minutes to complete a repair. When a machine breaks down, one of four repairpersons is called upon to do the repair. Both the time between breakdowns and the repair time are exponential. Toolco is interested in analyzing this situation and knowing the number of repairpersons needed to keep the shop running "smoothly." A = 12 = 0.5 breaks down per hour μ = 60/12 = 5 breaks down per hour System limit = K = 22 machines Source limit= K = 22 machines R = 1, 2, 3, 4. (M/M/R: GD/ K /K),
Expert Solution
steps

Step by step

Solved in 5 steps with 16 images

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Business in Action
Business in Action
Operations Management
ISBN:
9780135198100
Author:
BOVEE
Publisher:
PEARSON CO
Purchasing and Supply Chain Management
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.