THREE WIRE LEVELING DATA: The following data is a result of a three wire leveling in a proposed project to determine the elevation of an unknown point BM12. 1. Draw an approximate figure of the level route and determine the Elevation of BM12 and do the arithmetic check. Station Backsight HI Foresight Elevation Hair Mean S Hair Mean S reading Reading reading Reading BM10 1.567 1.234 1200 m 0.901 TP1 1.364 1.352 1.008 1.151 0.652 0.950 TP2 0.938 0.835 0.732 0.623 0.526 0.411 TP3 1.043 0.998 0.992 0.698 0.941 0.398 BM11 0.879 1.089 0.692 0.973 0.505 0.857 ТРА 1.217 0.957 1.079 0.682 0.941 0.407 TP5 1.321 1.119 1.105 0.978 0.889 0.837 TP6 0.992 1.091 0.782 0.919 0.572 0.474 BM12 0.957 0.723 0.498
THREE WIRE LEVELING DATA: The following data is a result of a three wire leveling in a proposed project to determine the elevation of an unknown point BM12. 1. Draw an approximate figure of the level route and determine the Elevation of BM12 and do the arithmetic check. Station Backsight HI Foresight Elevation Hair Mean S Hair Mean S reading Reading reading Reading BM10 1.567 1.234 1200 m 0.901 TP1 1.364 1.352 1.008 1.151 0.652 0.950 TP2 0.938 0.835 0.732 0.623 0.526 0.411 TP3 1.043 0.998 0.992 0.698 0.941 0.398 BM11 0.879 1.089 0.692 0.973 0.505 0.857 ТРА 1.217 0.957 1.079 0.682 0.941 0.407 TP5 1.321 1.119 1.105 0.978 0.889 0.837 TP6 0.992 1.091 0.782 0.919 0.572 0.474 BM12 0.957 0.723 0.498
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
Related questions
Question
![THREE WIRE LEVELING DATA:
The following data is a result of a three wire leveling in a proposed project to determine the
elevation of an unknown point BM12.
1. Draw an approximate figure of the level route and determine the Elevation of BM12 and do
the arithmetic check.
Station
Backsight
HI
Foresight
Elevation
Hair
Mean
S
Hair
Mean
S
reading
Reading
reading Reading
BM10
1.567
1.234
1200 m
0.901
TP1
1.364
1.352
1.008
1.151
0.652
0.950
TP2
0.938
0.835
0.732
0.623
0.526
0.411
ТРз
1.043
0.998
0.992
0.698
0.941
0.398
BM11
0.879
1.089
0.692
0.973
0.505
0.857
TP4
1.217
0.957
1.079
0.682
0.941
0.407
TP5
1.321
1.119
1.105
0.978
0.889
0.837
TP6
0.992
1.091
0.782
0.919
0.572
0.474
BM12
0.957
0.723
0.498
2. Determine the length of the leveling route if k = 0.987 and C = 0.30 m](/v2/_next/image?url=https%3A%2F%2Fcontent.bartleby.com%2Fqna-images%2Fquestion%2F5d0d94d5-bc05-4942-85b3-87d35f20e6f2%2F998da874-37a1-4e49-9ad1-c3dfa06cc5b1%2F3sat6ww_processed.jpeg&w=3840&q=75)
Transcribed Image Text:THREE WIRE LEVELING DATA:
The following data is a result of a three wire leveling in a proposed project to determine the
elevation of an unknown point BM12.
1. Draw an approximate figure of the level route and determine the Elevation of BM12 and do
the arithmetic check.
Station
Backsight
HI
Foresight
Elevation
Hair
Mean
S
Hair
Mean
S
reading
Reading
reading Reading
BM10
1.567
1.234
1200 m
0.901
TP1
1.364
1.352
1.008
1.151
0.652
0.950
TP2
0.938
0.835
0.732
0.623
0.526
0.411
ТРз
1.043
0.998
0.992
0.698
0.941
0.398
BM11
0.879
1.089
0.692
0.973
0.505
0.857
TP4
1.217
0.957
1.079
0.682
0.941
0.407
TP5
1.321
1.119
1.105
0.978
0.889
0.837
TP6
0.992
1.091
0.782
0.919
0.572
0.474
BM12
0.957
0.723
0.498
2. Determine the length of the leveling route if k = 0.987 and C = 0.30 m
Expert Solution
![](/static/compass_v2/shared-icons/check-mark.png)
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 2 images
![Blurred answer](/static/compass_v2/solution-images/blurred-answer.jpg)
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
![Structural Analysis](https://compass-isbn-assets.s3.amazonaws.com/isbn_cover_images/9781337630931/9781337630931_smallCoverImage.jpg)
![Structural Analysis (10th Edition)](https://www.bartleby.com/isbn_cover_images/9780134610672/9780134610672_smallCoverImage.gif)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
![Principles of Foundation Engineering (MindTap Cou…](https://www.bartleby.com/isbn_cover_images/9781337705028/9781337705028_smallCoverImage.gif)
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
![Structural Analysis](https://compass-isbn-assets.s3.amazonaws.com/isbn_cover_images/9781337630931/9781337630931_smallCoverImage.jpg)
![Structural Analysis (10th Edition)](https://www.bartleby.com/isbn_cover_images/9780134610672/9780134610672_smallCoverImage.gif)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
![Principles of Foundation Engineering (MindTap Cou…](https://www.bartleby.com/isbn_cover_images/9781337705028/9781337705028_smallCoverImage.gif)
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
![Fundamentals of Structural Analysis](https://www.bartleby.com/isbn_cover_images/9780073398006/9780073398006_smallCoverImage.gif)
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
![Sustainable Energy](https://www.bartleby.com/isbn_cover_images/9781337551663/9781337551663_smallCoverImage.gif)
![Traffic and Highway Engineering](https://www.bartleby.com/isbn_cover_images/9781305156241/9781305156241_smallCoverImage.jpg)
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning