Three transportation projects have been proposed to increase the safety in and around a residential neighborhood. Each project consists of upgrading existing street signing to highly retro reflective sheeting to increase visibility. The following table shows the initial construction costs, annual operating costs, useful life of the sheeting, and the salvage values for each alternative. Assume that the discount rate is 10%. Cal- culate the present worth for each alternative and determine the preferred project based on the economic criteria. Initial Anпual Salvage Value ($) Construction Operating Costs ($) Useful Life (Years) Alternative Costs ($) 2,000 1,200 12,000 12 2,500 II 10,000 3,500 III 16,000 2,250 5 800

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
100%
Help pls. Ill upvote
Three transportation projects have been proposed to increase the safety in and
around a residential neighborhood. Each project consists of upgrading existing street
signing to highly retro reflective sheeting to increase visibility. The following table
shows the initial construction costs, annual operating costs, useful life of the sheeting,
and the salvage values for each alternative. Assume that the discount rate is 10%. Cal-
culate the present worth for each alternative and determine the preferred project
based on the economic criteria.
Initial
Aппual
Construction
Operating
Costs ($)
Useful Life
(Years)
Salvage
Value ($)
Alternative
Costs ($)
12,000
2,000
12
2,500
II
10,000
1,200
9
3,500
III
16,000
2,250
5
800
Transcribed Image Text:Three transportation projects have been proposed to increase the safety in and around a residential neighborhood. Each project consists of upgrading existing street signing to highly retro reflective sheeting to increase visibility. The following table shows the initial construction costs, annual operating costs, useful life of the sheeting, and the salvage values for each alternative. Assume that the discount rate is 10%. Cal- culate the present worth for each alternative and determine the preferred project based on the economic criteria. Initial Aппual Construction Operating Costs ($) Useful Life (Years) Salvage Value ($) Alternative Costs ($) 12,000 2,000 12 2,500 II 10,000 1,200 9 3,500 III 16,000 2,250 5 800
Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Knowledge Booster
Team Management
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning