There is a plan to install a continuous loop conveyor system with a total length of 1,000 ft and a speed of 50 ft/min. The conveyor will have carriers separated by 25 ft. Each carrier can hold one part. A load station and an unload station are to be located 500 ft apart along the conveyor loop. Each day, the conveyor system is planned to operate as follows, starting empty at the beginning of the day. The load station will load parts at the rate of one part every 30 sec, continuing this loading operation for 10 min, then resting for 10 min during which no loading occurs. It will repeat this 20 min cycle of loading and then resting throughout the 8-hr shift. The unload station will wait until loaded carriers begin to arrive, then will unload parts at the rate of one part every minute during the 8 hr, continuing until all carriers are empty. Will the planned conveyor system work? Present calculations and arguments to justify your answer.
Heat Exchangers
Heat exchangers are the types of equipment that are primarily employed to transfer the thermal energy from one fluid to another, provided that one of the fluids should be at a higher thermal energy content than the other fluid.
Heat Exchanger
The heat exchanger is a combination of two words ''Heat'' and ''Exchanger''. It is a mechanical device that is used to exchange heat energy between two fluids.
There is a plan to install a continuous loop conveyor system with a total length of 1,000 ft
and a speed of 50 ft/min. The conveyor will have carriers separated by 25 ft. Each carrier can hold one part. A load station and an unload station are to be located 500 ft apart along the conveyor loop. Each day, the conveyor system is planned to operate as follows, starting empty at the beginning of the day. The load station will load parts at the rate of one part every 30 sec, continuing this loading operation for 10 min, then resting for 10 min during which no loading occurs. It will repeat this 20 min cycle of loading and then resting throughout the 8-hr shift. The unload station will wait until loaded carriers begin to arrive, then will unload parts at the rate of one part every minute during the 8 hr, continuing until all carriers are empty. Will the planned conveyor system work? Present calculations and arguments to justify your answer.
Trending now
This is a popular solution!
Step by step
Solved in 4 steps with 4 images