The voltage V, in the frequency-domain circuit shown in (Figure 1) is 120./0° V (ms). • Part A Find the average power for the voltage source. Use positive value if the power is absorbed by the voltage source and negative value if the power is delivered. Express your answer to three significant figures and include the appropriate units. * * O m ? Ponrca - 241.77 Submit Previous Answers Requaat Answer x Incorrect; Try Again; 5 attempts remaining Part B Find the reactive powver for the voltage source. Use positive value if the magnetizing vars are absorbed by the voltage source and negative value if the magnetizing vars are delivered. Express your answer in volt-amperes reactive to three significant figures. Quare VAR Submit Regueat Aneenr • Part C Find the average power associated with the capacitor in the circuit. Use positive value if the power is absorbed and negative value if the power is delivered. Express your answer to three significant figures and include the appropriate units. * * O = ? P. pan Value Units Submit Request Anewne Figure O 1 of 1 • Part D Find the reactive power associated with the capacitor in the circuit. Use positive value if the magnetizing vars are absorbed and negative value if the magnetizing vars are delivered. Express your answer in volt-amperes reactive to three significant figures. 100 120 VO AZO -/20 N j16N VAR Submit Reguest Anewer
Protection System
A system that protects electrical systems from faults by isolating the problematic part from the remainder of the system, preventing power from being cut from healthy elements, improving system dependability and efficiency is the protection system. Protection devices are the equipment that are utilized to implement the protection system.
Predictive Maintenance System
Predictive maintenance technologies are designed to assist in determining the state of in-service equipment so that maintenance can be scheduled. Predictive maintenance is the application of information; proactive maintenance approaches examine the condition of equipment and anticipate when it should maintain. The purpose of predictive maintenance is to forecast when equipment will fail (depending on a variety of parameters), then prevent the failure through routine and corrective maintenance.Condition monitoring is the continual monitoring of machines during process conditions to maintain optimal machine use, which is necessary for predictive maintenance. There are three types of condition monitoring: online, periodic, and remote. Finally, remote condition monitoring allows the equipment observed from a small place and data supplied for analysis.
Preventive Maintenance System
To maintain the equipment and materials on a regular basis in order to maintain those running conditions and reduce unnecessary shutdowns due to unexpected equipment failure is called Preventive Maintenance (PM).
Part D and part C are needed
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 2 images