The UWA local in Norwood, Ohio, has proposed wage concessions at that plant to raise employment. What is the smallest decrease in the wage rate at that plant that would increase employment there? 5. (A) What is the cost of assembling an extra automobile given the current output level of 1400 automobiles? (B) Is it feasible to produce 1,600 automobiles? If possible, provide the new total cost, if not possible explain why not? A team of production specialists has indicated that the auto manufacturer can achieve efficiencies at its Norwood plant by reconfiguring the assembly line. The reconfiguration has the effect of increasing the productivity of the labor at this plant from 1 hours to 0.8 hour per automobile. By how much will the firm's costs fall as a result of this change, assuming that it continues to produce 1400 automobiles? The company introduced a new technology for the machines that will increase the total capacity in both Kingsport and Bakersfield plants by 20 hours, what changes in cost you expect to happen, explain your answer based on the sensitivity analysis report? 7.

Computer Networking: A Top-Down Approach (7th Edition)
7th Edition
ISBN:9780133594140
Author:James Kurose, Keith Ross
Publisher:James Kurose, Keith Ross
Chapter1: Computer Networks And The Internet
Section: Chapter Questions
Problem R1RQ: What is the difference between a host and an end system? List several different types of end...
icon
Related questions
Question

Please help me answering this and attach the excel file

4.
The UWA local in Norwood, Ohio, has proposed wage concessions at that
plant to raise employment. What is the smallest decrease in the wage rate at that plant
that would increase employment there?
5.
(A) What is the cost of assembling an extra automobile given the current
output level of 1400 automobiles? (B) Is it feasible to produce 1,600 automobiles? If
possible, provide the new total cost, if not possible explain why not?
6
A team of production specialists has indicated that the auto manufacturer can
achieve efficiencies at its Norwood plant by reconfiguring the assembly line. The
reconfiguration has the effect of increasing the productivity of the labor at this plant from
1 hours to 0.8 hour per automobile. By how much will the firm's costs fall as a result of
this change, assuming that it continues to produce 1400 automobiles?
7.
The company introduced a new technology for the machines that will increase
the total capacity in both Kingsport and Bakersfield plants by 20 hours, what changes in
cost you expect to happen, explain your answer based on the sensitivity analysis report?
Transcribed Image Text:4. The UWA local in Norwood, Ohio, has proposed wage concessions at that plant to raise employment. What is the smallest decrease in the wage rate at that plant that would increase employment there? 5. (A) What is the cost of assembling an extra automobile given the current output level of 1400 automobiles? (B) Is it feasible to produce 1,600 automobiles? If possible, provide the new total cost, if not possible explain why not? 6 A team of production specialists has indicated that the auto manufacturer can achieve efficiencies at its Norwood plant by reconfiguring the assembly line. The reconfiguration has the effect of increasing the productivity of the labor at this plant from 1 hours to 0.8 hour per automobile. By how much will the firm's costs fall as a result of this change, assuming that it continues to produce 1400 automobiles? 7. The company introduced a new technology for the machines that will increase the total capacity in both Kingsport and Bakersfield plants by 20 hours, what changes in cost you expect to happen, explain your answer based on the sensitivity analysis report?
Ford has three assembly plants located in various parts of the country. The first
plant (built in 1937 and located in Norwood, Ohio) requires 1 hours of labor and 2 hour of
machine time to assemble one automobile. The second plant (built in 1958 and located in
Bakersfield, California) requires 0.5 hours of labor and 2.5 hours of machine time to assemble
one automobile. The third plant (built in 1981 and located in Kingsport, Tennessee) requires
1.1 hours of labor and 1.5 hours of machine time to assemble one automobile. The firm pays
$32 per hour of labor and $10 per hour of machine time at each of its plants. The first plant
has a capacity of 600 hours of machine time per day; the second, 1100 hours; and the third,
1,000 hours. The manufacturer's production target is 1400 automobiles per day. The
production department sets each plant's schedule by solving a linear programming problem
designed to identify the cost-minimizing pattern of assembly across the three plants.
Use EXCEL Solver to determine the cost-minimizing method of meeting Ford's
1.
daily production target. Discuss the solution.
2.
Based on the optimum solution of your LP model, which plant do you
recommend having more orders in the future in case of over-loaded plants or the firm is
having more orders than usual?
3.
Obtain the sensitivity report of EXCEL Solver and discuss the report.
ONLY use the Sensitivity Report to answer tasks (5 to 7)
Transcribed Image Text:Ford has three assembly plants located in various parts of the country. The first plant (built in 1937 and located in Norwood, Ohio) requires 1 hours of labor and 2 hour of machine time to assemble one automobile. The second plant (built in 1958 and located in Bakersfield, California) requires 0.5 hours of labor and 2.5 hours of machine time to assemble one automobile. The third plant (built in 1981 and located in Kingsport, Tennessee) requires 1.1 hours of labor and 1.5 hours of machine time to assemble one automobile. The firm pays $32 per hour of labor and $10 per hour of machine time at each of its plants. The first plant has a capacity of 600 hours of machine time per day; the second, 1100 hours; and the third, 1,000 hours. The manufacturer's production target is 1400 automobiles per day. The production department sets each plant's schedule by solving a linear programming problem designed to identify the cost-minimizing pattern of assembly across the three plants. Use EXCEL Solver to determine the cost-minimizing method of meeting Ford's 1. daily production target. Discuss the solution. 2. Based on the optimum solution of your LP model, which plant do you recommend having more orders in the future in case of over-loaded plants or the firm is having more orders than usual? 3. Obtain the sensitivity report of EXCEL Solver and discuss the report. ONLY use the Sensitivity Report to answer tasks (5 to 7)
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Recommended textbooks for you
Computer Networking: A Top-Down Approach (7th Edi…
Computer Networking: A Top-Down Approach (7th Edi…
Computer Engineering
ISBN:
9780133594140
Author:
James Kurose, Keith Ross
Publisher:
PEARSON
Computer Organization and Design MIPS Edition, Fi…
Computer Organization and Design MIPS Edition, Fi…
Computer Engineering
ISBN:
9780124077263
Author:
David A. Patterson, John L. Hennessy
Publisher:
Elsevier Science
Network+ Guide to Networks (MindTap Course List)
Network+ Guide to Networks (MindTap Course List)
Computer Engineering
ISBN:
9781337569330
Author:
Jill West, Tamara Dean, Jean Andrews
Publisher:
Cengage Learning
Concepts of Database Management
Concepts of Database Management
Computer Engineering
ISBN:
9781337093422
Author:
Joy L. Starks, Philip J. Pratt, Mary Z. Last
Publisher:
Cengage Learning
Prelude to Programming
Prelude to Programming
Computer Engineering
ISBN:
9780133750423
Author:
VENIT, Stewart
Publisher:
Pearson Education
Sc Business Data Communications and Networking, T…
Sc Business Data Communications and Networking, T…
Computer Engineering
ISBN:
9781119368830
Author:
FITZGERALD
Publisher:
WILEY