The Undisturbed soil at a given borrow pit is found to have the following parameters. The water content is 15%, the void ratio is 0.60 and the specific gravity of the solids is 2.70. The soil from this borrow pit is to be used to construct a rolled fill having a finished volume of 50,000 yd3 . The soil is excavated by means of a shovel and dumped on trucks. When loaded to capacity these trucks are found to contain, on average, a net weight of wet soil equal to 13,000 lbs. In the construction process, the trucks dump their load on the fill, the material is spread and broken up, after which a sprinkler adds water until the water content is equal to 18%. The soil and water are thoroughly mixed by means of dicers (or other similar equipment) and then compacted until the dry unit weight γd=110 lbs/ft3. Helpful Conversions (3ft=1yd), (γw=62.4 lbs/ft3), (7.48gal/1ft3 ) a) Assuming that each load is a capacity load, how many truck loads are required to construct the fill? b) What is the volume in yd3 of material that must be removed from the borrow pit to construct the fill? c) How many gallons of water will have to be added per truck load assuming that the moisture lost by evaporation, hauling and handling is negligible?

Principles of Foundation Engineering (MindTap Course List)
9th Edition
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Braja M. Das, Nagaratnam Sivakugan
Chapter2: Geotechnical Properties Of Soil
Section: Chapter Questions
Problem 2.4P
icon
Related questions
Question

GEOTECHNICAL ENGINEERING:

The Undisturbed soil at a given borrow pit is found to have the following parameters. The water content is 15%, the void ratio is 0.60 and the specific gravity of the solids is 2.70. The soil from this borrow pit is to be used to construct a rolled fill having a finished volume of 50,000 yd3 . The soil is excavated by means of a shovel and dumped on trucks. When loaded to capacity these trucks are found to contain, on average, a net weight of wet soil equal to 13,000 lbs. In the construction process, the trucks dump their load on the fill, the material is spread and broken up, after which a sprinkler adds water until the water content is equal to 18%. The soil and water are thoroughly mixed by means of dicers (or other similar equipment) and then compacted until the dry unit weight γd=110 lbs/ft3. Helpful Conversions (3ft=1yd), (γw=62.4 lbs/ft3), (7.48gal/1ft3 )

a) Assuming that each load is a capacity load, how many truck loads are required to construct the fill?

b) What is the volume in yd3 of material that must be removed from the borrow pit to construct the fill?

c) How many gallons of water will have to be added per truck load assuming that the moisture lost by evaporation, hauling and handling is negligible?

Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 4 steps with 13 images

Blurred answer
Knowledge Booster
Pricing excavation and backfill
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Principles of Geotechnical Engineering (MindTap C…
Principles of Geotechnical Engineering (MindTap C…
Civil Engineering
ISBN:
9781305970939
Author:
Braja M. Das, Khaled Sobhan
Publisher:
Cengage Learning
Construction Materials, Methods and Techniques (M…
Construction Materials, Methods and Techniques (M…
Civil Engineering
ISBN:
9781305086272
Author:
William P. Spence, Eva Kultermann
Publisher:
Cengage Learning