The time-phased net requirements for the base assembly in a table lamp over the next six weeks are: Week 1 2 3 4 5 6 Requirements 335 240 180 320 320 200 The setup cost for the construction of the base assembly is $200, and the holding cost is $0.30 per assembly per week. What lot sizing do you obtain from the EOQ formula? Determine the lot sizes using the Silver–Meal heuristic. Determine the lot sizes using the least unit cost heuristic. Determine the lot sizes using part period balancing. Determine the lot size using the Wagner–Whitin algorithm. Compare the holding and setup costs obtained over the six periods using the policies found in parts (a) through (e) with the cost of a lot-for-lot policy
The time-phased net requirements for the base assembly in a table lamp over the next six weeks are: Week 1 2 3 4 5 6 Requirements 335 240 180 320 320 200 The setup cost for the construction of the base assembly is $200, and the holding cost is $0.30 per assembly per week. What lot sizing do you obtain from the EOQ formula? Determine the lot sizes using the Silver–Meal heuristic. Determine the lot sizes using the least unit cost heuristic. Determine the lot sizes using part period balancing. Determine the lot size using the Wagner–Whitin algorithm. Compare the holding and setup costs obtained over the six periods using the policies found in parts (a) through (e) with the cost of a lot-for-lot policy
Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
Related questions
Question
- The time-phased net requirements for the base assembly in a table lamp over the next six weeks are:
Week |
1 |
2 |
3 |
4 |
5 |
6 |
Requirements |
335 |
240 |
180 |
320 |
320 |
200 |
The setup cost for the construction of the base assembly is $200, and the holding cost is $0.30 per assembly per week.
- What lot sizing do you obtain from the EOQ formula?
- Determine the lot sizes using the Silver–Meal heuristic.
- Determine the lot sizes using the least unit cost heuristic.
- Determine the lot sizes using part period balancing.
- Determine the lot size using the Wagner–Whitin algorithm.
- Compare the holding and setup costs obtained over the six periods using the policies found in parts (a) through (e) with the cost of a lot-for-lot policy.
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
Recommended textbooks for you
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.