The plans for a concrete patio call for a  7ft  by  18ft  slab of concrete  8  inches thick, which has a total volume of  3.11  cubic yards. The contractor estimates the amount needed at  4  cubic yards. If concrete costs  $119.26  per cubic yard, find the cost of wasted concrete. Round to the nearest cent.

Advanced Engineering Mathematics
10th Edition
ISBN:9780470458365
Author:Erwin Kreyszig
Publisher:Erwin Kreyszig
Chapter2: Second-order Linear Odes
Section: Chapter Questions
Problem 1RQ
icon
Related questions
Question

The plans for a concrete patio call for a 

7ft
 by 
18ft
 slab of concrete 
8
 inches thick, which has a total volume of 
3.11
 cubic yards. The contractor estimates the amount needed at 
4
 cubic yards. If concrete costs 
$119.26
 per cubic yard, find the cost of wasted concrete. Round to the nearest cent.

 

 
The cost of the wasted concrete would be 
$
, rounded to the nearest cent.
 
 
 
 
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Similar questions
Recommended textbooks for you
Advanced Engineering Mathematics
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
Numerical Methods for Engineers
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
Introductory Mathematics for Engineering Applicat…
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
Mathematics For Machine Technology
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,
Basic Technical Mathematics
Basic Technical Mathematics
Advanced Math
ISBN:
9780134437705
Author:
Washington
Publisher:
PEARSON
Topology
Topology
Advanced Math
ISBN:
9780134689517
Author:
Munkres, James R.
Publisher:
Pearson,