The photopolymer used to produce the hollow trapezoidal prism in the previous calculation costs R3 480/litre. The SL machine cost rate = R232.00/hr. Assume that all of the liquid photopolymer not used for the part can be reused. Labour rate R 280.00/hr, but labour utilization during the build cycle is only = 13%. Post-processing time = 6.9 min/part. If the cycle time for the hollow trapezoidal prism is 420 minutes, determine the part cost.

Elementary Geometry For College Students, 7e
7th Edition
ISBN:9781337614085
Author:Alexander, Daniel C.; Koeberlein, Geralyn M.
Publisher:Alexander, Daniel C.; Koeberlein, Geralyn M.
ChapterP: Preliminary Concepts
SectionP.CT: Test
Problem 1CT
icon
Related questions
Question

The photopolymer used to produce the hollow trapezoidal prism in the previous calculation costs R3 480/litre. The SL machine cost rate = R232.00/hr. Assume that all of the liquid photopolymer not used for the part can be reused. Labour rate R 280.00/hr, but labour utilization during the build cycle is only = 13%. Post-processing time = 6.9 min/part. If the cycle time for the hollow trapezoidal prism is 420 minutes, determine the part cost.

d
s1
H
s2
b
Transcribed Image Text:d s1 H s2 b
Expert Solution
steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Similar questions
Recommended textbooks for you
Elementary Geometry For College Students, 7e
Elementary Geometry For College Students, 7e
Geometry
ISBN:
9781337614085
Author:
Alexander, Daniel C.; Koeberlein, Geralyn M.
Publisher:
Cengage,
Elementary Geometry for College Students
Elementary Geometry for College Students
Geometry
ISBN:
9781285195698
Author:
Daniel C. Alexander, Geralyn M. Koeberlein
Publisher:
Cengage Learning