The following Tableo show the rainfall hyetograph for 2 hours rainfall storm and the resultant hydrograph from a watershed with an area of 100 Km?. The rainfall depth P= 2 mm and the discharge Q = 5.5 m/a. Answer the following quetions by selecting the correct answer for each: Rainfall heytograph Period (hr) Runoff Hydrograph Time (hr) a(m3/s) P(mm) 0-0.5 0.5-1 2*P 1"Q 1-1.5 3*p 2"Q 1.5 -2 4*P 4 4*Q 5 3"Q 1. What io the peak clischarge for this storm, Qp? 2. What is the total rainfall clepth for this storm, P? 3. Calculate the rainfall intensity in the third period (1-1.5 hr), i. 4. Calculate the depth of runoff, R. 5. Calculate the phi-Index for this watershed. 6. Calculate the peak discharge for the Unit hydrograph, QP-UH in m3/s.

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
icon
Concept explainers
Question
The following Tables show the rainfall hyetograph for 2 hours rainfall storm and the resultant hydrograph from a watershed
with an area of 100 Km². The rainfall depth P = 2 mm and the discharge Q = 5.5 m'/s. Answer the following questions by
selecting the correct answer for each:
Rainfall heytograph
Period (hr)
Runoff Hydrograph
Time (hr) a (m3/s)
P (mm)
0-0.5
0.5-1
2*P
1
1-1.5
3*P
2"Q
1.5-2
4*p
3
3*Q
4
4"Q
3"Q
6
1. What is the peak clischarge for this stom, Qp?
2. What is the total rainfall dlepth for this storm, P?
3. Calculate the rainfall intensity in the third period (1-1.5 hr), i.
4. Calculate the depth of runoff, R.
5. Calculate the phi-Index for this watershed.
6. Calculate the peak discharge for the Unit hydrograph, QP-UH in m3/s.
Transcribed Image Text:The following Tables show the rainfall hyetograph for 2 hours rainfall storm and the resultant hydrograph from a watershed with an area of 100 Km². The rainfall depth P = 2 mm and the discharge Q = 5.5 m'/s. Answer the following questions by selecting the correct answer for each: Rainfall heytograph Period (hr) Runoff Hydrograph Time (hr) a (m3/s) P (mm) 0-0.5 0.5-1 2*P 1 1-1.5 3*P 2"Q 1.5-2 4*p 3 3*Q 4 4"Q 3"Q 6 1. What is the peak clischarge for this stom, Qp? 2. What is the total rainfall dlepth for this storm, P? 3. Calculate the rainfall intensity in the third period (1-1.5 hr), i. 4. Calculate the depth of runoff, R. 5. Calculate the phi-Index for this watershed. 6. Calculate the peak discharge for the Unit hydrograph, QP-UH in m3/s.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 6 steps with 4 images

Blurred answer
Knowledge Booster
Precipitation
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning