The following table details the tasks required for Indiana-based Frank Pianki Industries to manufacture a fully portable industrial vacuum cleaner. The times in the table are in minutes. Demand forecasts indicate a need to operate with a cycle time of 11 minutes Fig. 1 Performance Activity Activity Description Time (mins) Predecessors A Attach wheels to tub B Attach motor to lid Attach battery pack Attach safety cutoff 4.0 1.8 3.0 B D 3.8 E Attach filters 3.0 B Fig. 2 F Attach lid to tub 2.0 A, E Assemble 2.8 attachments B) Function test 4.0 D, F, G Final inspection 2.0 H J Packing 2.0 a-b) One of the possible assignment of tasks to workstations is shown correctly in The efficiency of the assembly line with 3 workstations = | ]% (enter your response rounded to two decimal places). Fig. 3 c) The goal is to have 100% efficiency Is this possible? B d) The theoretical minimum number of workstations = (round your response up to the next whole number).
The following table details the tasks required for Indiana-based Frank Pianki Industries to manufacture a fully portable industrial vacuum cleaner. The times in the table are in minutes. Demand forecasts indicate a need to operate with a cycle time of 11 minutes Fig. 1 Performance Activity Activity Description Time (mins) Predecessors A Attach wheels to tub B Attach motor to lid Attach battery pack Attach safety cutoff 4.0 1.8 3.0 B D 3.8 E Attach filters 3.0 B Fig. 2 F Attach lid to tub 2.0 A, E Assemble 2.8 attachments B) Function test 4.0 D, F, G Final inspection 2.0 H J Packing 2.0 a-b) One of the possible assignment of tasks to workstations is shown correctly in The efficiency of the assembly line with 3 workstations = | ]% (enter your response rounded to two decimal places). Fig. 3 c) The goal is to have 100% efficiency Is this possible? B d) The theoretical minimum number of workstations = (round your response up to the next whole number).
Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
Related questions
Question
Layout Strategies
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 5 steps with 1 images
Recommended textbooks for you
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.