The following data are extracted from a pipe-layıng conuacl. • Concrete pipe diameter: inside 300mm, outside 334mm • Overall pipe length = 925m • Width of the trench = 750mm %3D %3D Trench depths are: 1.5m for 631m reach, 2m for 274m reach and 2.5m for 20m reach Calculate the total cost and cost for each depth to a contractor of excavation, planking and strutt laying pipes, surrounding concrete as shown in the figure below and backfilling using the follow data. Suitable material Concrete class E 150mm min. Cover 334mm may be formed Thorizaontal surface 100mm Width of trench = 750mm Labour and plant for pipe-laying (up to 300mm diameter): One JCB 3C excavator @ $25/hr, Small plant, pumps and compactor @ $3/7/hr, One pipe-layer @ $15/hr, • Two labourers @ $10/hr each Assume a working week is 50hrs. Also, assume an average output of 50 linear meteres of pipe laid per week, the output vaerying with the depth of trench. The output indcludes axcavating, trimming. pipe laing, concreting and backfilling.
The following data are extracted from a pipe-layıng conuacl. • Concrete pipe diameter: inside 300mm, outside 334mm • Overall pipe length = 925m • Width of the trench = 750mm %3D %3D Trench depths are: 1.5m for 631m reach, 2m for 274m reach and 2.5m for 20m reach Calculate the total cost and cost for each depth to a contractor of excavation, planking and strutt laying pipes, surrounding concrete as shown in the figure below and backfilling using the follow data. Suitable material Concrete class E 150mm min. Cover 334mm may be formed Thorizaontal surface 100mm Width of trench = 750mm Labour and plant for pipe-laying (up to 300mm diameter): One JCB 3C excavator @ $25/hr, Small plant, pumps and compactor @ $3/7/hr, One pipe-layer @ $15/hr, • Two labourers @ $10/hr each Assume a working week is 50hrs. Also, assume an average output of 50 linear meteres of pipe laid per week, the output vaerying with the depth of trench. The output indcludes axcavating, trimming. pipe laing, concreting and backfilling.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
Related questions
Question
100%
please help my homneworkkk ı need a good solution


Transcribed Image Text:The following data are extracted from a pipe-layıng conuacl.
• Concrete pipe diameter: inside 300mm, outside 334mm
• Overall pipe length = 925m
• Width of the trench = 750mm
%3D
%3D
Trench depths are: 1.5m for 631m reach, 2m for 274m reach and 2.5m for 20m reach
Calculate the total cost and cost for each depth to a contractor of excavation, planking and strutt
laying pipes, surrounding concrete as shown in the figure below and backfilling using the follow
data.
Suitable material
Concrete class E
150mm min. Cover
334mm
may be formed
Thorizaontal surface
100mm
Width of trench = 750mm
Labour and plant for pipe-laying (up to 300mm diameter):
One JCB 3C excavator @ $25/hr,
Small plant, pumps and compactor @ $3/7/hr,
One pipe-layer @ $15/hr,
• Two labourers @ $10/hr each
Assume a working week is 50hrs. Also, assume an average output of 50 linear meteres of pipe laid
per week, the output vaerying with the depth of trench. The output indcludes axcavating, trimming.
pipe laing, concreting and backfilling.
Expert Solution

This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 3 steps with 10 images

Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you


Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON

Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning


Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON

Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning

Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education


Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning