The Flames Pool Company (FPC) was hired to drain a swimming pool when it is raining outside.  If it is raining at a rate of 2 inches/hour and the flat swimming pool bottom surface area is 2000 ft2 answer the following two questions:   What pump capacity in gallons/minute (gpm) must FPC use to keep the rain water accumulating in the swimming pool at a constant rate? What pump capacity in gpm must FPC use to reduce the rain water accumulation in the swimming pool at a rate of 4 inches/hour.

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question

The Flames Pool Company (FPC) was hired to drain a swimming pool when it is raining outside.  If it is raining at a rate of 2 inches/hour and the flat swimming pool bottom surface area is 2000 ft2 answer the following two questions:

 

  1. What pump capacity in gallons/minute (gpm) must FPC use to keep the rain water accumulating in the swimming pool at a constant rate?
  2. What pump capacity in gpm must FPC use to reduce the rain water accumulation in the swimming pool at a rate of 4 inches/hour.
The Flames Pool Company (FPC) was hired to drain a swimming pool when it is raining outside.
If it is raining at a rate of 2 inches/hour and the flat swimming pool bottom surface area is 2000
ft² answer the following two questions:
a) What pump capacity in gallons/minute (gpm) must FPC use to keep the rain water
accumulating in the swimming pool at a constant rate?
b)
What pump capacity in gpm must FPC use to reduce the rain water accumulation in the
swimming pool at a rate of 4 inches/hour.
Transcribed Image Text:The Flames Pool Company (FPC) was hired to drain a swimming pool when it is raining outside. If it is raining at a rate of 2 inches/hour and the flat swimming pool bottom surface area is 2000 ft² answer the following two questions: a) What pump capacity in gallons/minute (gpm) must FPC use to keep the rain water accumulating in the swimming pool at a constant rate? b) What pump capacity in gpm must FPC use to reduce the rain water accumulation in the swimming pool at a rate of 4 inches/hour.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps with 13 images

Blurred answer
Knowledge Booster
Thermal processes
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning