The figure below shows a soil profile located at a site for a bridge construction. The profile consists of a layer of normally consolidated clay with thickness of 5.0 m laying over the bedrock and overlain by layer of sand with thickness of 5 m. The water table is observed to be at 2.0 m below the ground surface. A shallow foundation is designed to support the bridge pier at this site. The vertical load imposed on the foundation is Q= 850 kN. A 2.5 cm maximum settlement criterion was set for the foundation. A square footing with B=L=1.0 m was proposed to be constructed at the ground surface to supnort the pier. 1. Assumi g that consolidation settlement is the onlclement conouting to the tal settlen ent of the fou dation, doas the fo ation zet uesignpecie 2. To ensire ta the fou dation mee sign conso date he clay 1 yer. Th ulickn ss the son is 1.0r and the dry ur weight of the soil is 17 N/m ification a layer of soil fill is v ll placed to pre- Ho much oes the soil settle nder the fl. Upd the oil profile after i fill is re noved at the end of cor olidation. what the over-consolidatiratio of he clay layer in thew soil profile. 3. Hov much is the andation expect u settle in he currensoll profile. 4. Afte the soil has n pre-conso dated, n table has ential toonne top of the clay layer. h change at this point. Two altemative solutions are proposed to mitigate the settlement that may occur due to the GWT drop, a. Increasing the dimensions of the footing supporting the pier, to reduce the increase in stress nie uric reading indicated ththe ground water e bridge pier settlement due to the impose load from the pier. b. Replace a portion of the sand layer with geofoam' (p=11kg/m³) to reduce the overburden stress on the clay layer. As an engineer you need to decide on which is the most suitable approach to use and provide the supporting calculations. GL 2.0 m Gs=2.65 e=0.55 Sand 3.0 m Gs=2.78 w=25% Clay 5.0 m Cc=0.28 9 Cs=0.056 Bedrock Note: using a spreadsheet to perform you calculations will help in editing and revising. Make sure the formulas used in your calculations are included in your solution.
The figure below shows a soil profile located at a site for a bridge construction. The profile consists of a layer of normally consolidated clay with thickness of 5.0 m laying over the bedrock and overlain by layer of sand with thickness of 5 m. The water table is observed to be at 2.0 m below the ground surface. A shallow foundation is designed to support the bridge pier at this site. The vertical load imposed on the foundation is Q= 850 kN. A 2.5 cm maximum settlement criterion was set for the foundation. A square footing with B=L=1.0 m was proposed to be constructed at the ground surface to supnort the pier. 1. Assumi g that consolidation settlement is the onlclement conouting to the tal settlen ent of the fou dation, doas the fo ation zet uesignpecie 2. To ensire ta the fou dation mee sign conso date he clay 1 yer. Th ulickn ss the son is 1.0r and the dry ur weight of the soil is 17 N/m ification a layer of soil fill is v ll placed to pre- Ho much oes the soil settle nder the fl. Upd the oil profile after i fill is re noved at the end of cor olidation. what the over-consolidatiratio of he clay layer in thew soil profile. 3. Hov much is the andation expect u settle in he currensoll profile. 4. Afte the soil has n pre-conso dated, n table has ential toonne top of the clay layer. h change at this point. Two altemative solutions are proposed to mitigate the settlement that may occur due to the GWT drop, a. Increasing the dimensions of the footing supporting the pier, to reduce the increase in stress nie uric reading indicated ththe ground water e bridge pier settlement due to the impose load from the pier. b. Replace a portion of the sand layer with geofoam' (p=11kg/m³) to reduce the overburden stress on the clay layer. As an engineer you need to decide on which is the most suitable approach to use and provide the supporting calculations. GL 2.0 m Gs=2.65 e=0.55 Sand 3.0 m Gs=2.78 w=25% Clay 5.0 m Cc=0.28 9 Cs=0.056 Bedrock Note: using a spreadsheet to perform you calculations will help in editing and revising. Make sure the formulas used in your calculations are included in your solution.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
Related questions
Question
Please solve only part 5
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 2 steps with 2 images
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning