The Dubuque Cement Company packs 80-pound bags of concrete mix. Time-study data for the filling activity are shown in the following table. Because of the high physical demands of the job, the company's policy is a 23% allowance for workers. (Round all intermediate calculations to two decimal places before proceeding with further calculations.) Element Grasp and place bag Fill bag Seal bag Place bag on conveyor Performance Rating 115% 80% 105% 95% *Bag breaks open; included as delay in the allowance factor ^ Conveyor jams; included as delay in the allowance factor a) The standard time for this process = 1 8 36 16 8 Observation (seconds) 2 9 40 16 6 3 8 38 13 9 seconds (round your response to two decimal places). 4 12 36 21 31^ 5 6 114 18 34

Elements Of Electromagnetics
7th Edition
ISBN:9780190698614
Author:Sadiku, Matthew N. O.
Publisher:Sadiku, Matthew N. O.
ChapterMA: Math Assessment
Section: Chapter Questions
Problem 1.1MA
icon
Related questions
Question
The Dubuque Cement Company packs 80-pound bags of concrete mix. Time-study data for the filling activity are shown in the
following table. Because of the high physical demands of the job, the company's policy is a 23% allowance for workers. (Round
all intermediate calculations to two decimal places before proceeding with further calculations.)
Element
Grasp and place bag
Fill bag
Seal bag
Place bag on conveyor
Performance
Rating
115%
80%
105%
95%
*Bag breaks open; included as delay in the allowance factor
^ Conveyor jams; included as delay in the allowance factor
a) The standard time for this process =
1
8
36
16
8
Observation (seconds)
2
9
40
16
6
3
8
38
13
9
seconds (round your response to two decimal places).
4
12
36
21
31A
5
6
114
18
34^
Transcribed Image Text:The Dubuque Cement Company packs 80-pound bags of concrete mix. Time-study data for the filling activity are shown in the following table. Because of the high physical demands of the job, the company's policy is a 23% allowance for workers. (Round all intermediate calculations to two decimal places before proceeding with further calculations.) Element Grasp and place bag Fill bag Seal bag Place bag on conveyor Performance Rating 115% 80% 105% 95% *Bag breaks open; included as delay in the allowance factor ^ Conveyor jams; included as delay in the allowance factor a) The standard time for this process = 1 8 36 16 8 Observation (seconds) 2 9 40 16 6 3 8 38 13 9 seconds (round your response to two decimal places). 4 12 36 21 31A 5 6 114 18 34^
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps with 1 images

Blurred answer
Knowledge Booster
Composite Materials
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, mechanical-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Elements Of Electromagnetics
Elements Of Electromagnetics
Mechanical Engineering
ISBN:
9780190698614
Author:
Sadiku, Matthew N. O.
Publisher:
Oxford University Press
Mechanics of Materials (10th Edition)
Mechanics of Materials (10th Edition)
Mechanical Engineering
ISBN:
9780134319650
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Thermodynamics: An Engineering Approach
Thermodynamics: An Engineering Approach
Mechanical Engineering
ISBN:
9781259822674
Author:
Yunus A. Cengel Dr., Michael A. Boles
Publisher:
McGraw-Hill Education
Control Systems Engineering
Control Systems Engineering
Mechanical Engineering
ISBN:
9781118170519
Author:
Norman S. Nise
Publisher:
WILEY
Mechanics of Materials (MindTap Course List)
Mechanics of Materials (MindTap Course List)
Mechanical Engineering
ISBN:
9781337093347
Author:
Barry J. Goodno, James M. Gere
Publisher:
Cengage Learning
Engineering Mechanics: Statics
Engineering Mechanics: Statics
Mechanical Engineering
ISBN:
9781118807330
Author:
James L. Meriam, L. G. Kraige, J. N. Bolton
Publisher:
WILEY