The controller for Tender Bird Poultry, Inc. estimates that the company’s fixed overhead is $100,000 per year. She also has determined that the variable overhead is approximately $.10 per chicken raised and sold. Since the firm has a single product, overhead is applied on the basis of output units, chickens raised and sold.Required:1. Calculate the predetermined overhead rate under each of the following output predictions: 200,000 chickens, 300,000 chickens, and 400,000 chickens.2. Does the predetermined overhead rate change in proportion to the change in predicted production? Why?
Process Costing
Process costing is a sort of operation costing which is employed to determine the value of a product at each process or stage of producing process, applicable where goods produced from a series of continuous operations or procedure.
Job Costing
Job costing is adhesive costs of each and every job involved in the production processes. It is an accounting measure. It is a method which determines the cost of specific jobs, which are performed according to the consumer’s specifications. Job costing is possible only in businesses where the production is done as per the customer’s requirement. For example, some customers order to manufacture furniture as per their needs.
ABC Costing
Cost Accounting is a form of managerial accounting that helps the company in assessing the total variable cost so as to compute the cost of production. Cost accounting is generally used by the management so as to ensure better decision-making. In comparison to financial accounting, cost accounting has to follow a set standard ad can be used flexibly by the management as per their needs. The types of Cost Accounting include – Lean Accounting, Standard Costing, Marginal Costing and Activity Based Costing.
The controller for Tender Bird Poultry, Inc. estimates that the company’s fixed
Required:
1. Calculate the predetermined overhead rate under each of the following output predictions: 200,000 chickens, 300,000 chickens, and 400,000 chickens.
2. Does the predetermined overhead rate change in proportion to the change in predicted production? Why?