The chip is ready for production when reliability reaches 95%. When does the logistic model predict the chip will be ready for production? Round your answer to the nearest month. (Use the model found in part (a).)

Advanced Engineering Mathematics
10th Edition
ISBN:9780470458365
Author:Erwin Kreyszig
Publisher:Erwin Kreyszig
Chapter2: Second-order Linear Odes
Section: Chapter Questions
Problem 1RQ
icon
Related questions
Topic Video
Question

(c) The chip is ready for production when reliability reaches 95%. When does the logistic model predict the chip will be ready for production?

Round your answer to the nearest month. (Use the model found in part (a).)

A company is developing a new computer chip. Each month a collection of prototypes is tested and the percentage Pof chips that operate successfully is recorded. Here are the results.
5 6
m = month
P = % successful
1
2
3
4
7
23
29
35
45
52
63
70
(a) Find a logistic model for P versus m.
114.32
O P=
1+ 5.54e 0.313m
57.16
O P=
1+ 6.65e-0.157m
124.82
OP=
-D.104m
1+ 1.11e
38.11
O P =
1+ 13.85e-0.078m
22.86
OP =
1+ 2.77e-0.063m
(b) A reliability curve is a graph of percentage of successes versus time. Make a reliability curve for this computer chip. Include both the data and the model in your graph, and cover months
from 0 to 15.
P.
120
120
100
100
80
80
60
60
40
40
20
20
2
10
12
14
4
8
10
12
14
120
120
100
100
80
80
60
60
40
40
20
20
m
14
14
10
12
2
4
6.
10
12
(c) The chip is ready for production when reliability reaches 95%. When does the logistic model predict the chip will be ready for production? Round your answer to the nearest month. (Use
the model found in part (a).)
Transcribed Image Text:A company is developing a new computer chip. Each month a collection of prototypes is tested and the percentage Pof chips that operate successfully is recorded. Here are the results. 5 6 m = month P = % successful 1 2 3 4 7 23 29 35 45 52 63 70 (a) Find a logistic model for P versus m. 114.32 O P= 1+ 5.54e 0.313m 57.16 O P= 1+ 6.65e-0.157m 124.82 OP= -D.104m 1+ 1.11e 38.11 O P = 1+ 13.85e-0.078m 22.86 OP = 1+ 2.77e-0.063m (b) A reliability curve is a graph of percentage of successes versus time. Make a reliability curve for this computer chip. Include both the data and the model in your graph, and cover months from 0 to 15. P. 120 120 100 100 80 80 60 60 40 40 20 20 2 10 12 14 4 8 10 12 14 120 120 100 100 80 80 60 60 40 40 20 20 m 14 14 10 12 2 4 6. 10 12 (c) The chip is ready for production when reliability reaches 95%. When does the logistic model predict the chip will be ready for production? Round your answer to the nearest month. (Use the model found in part (a).)
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps

Blurred answer
Knowledge Booster
Data Collection, Sampling Methods, and Bias
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, advanced-math and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Advanced Engineering Mathematics
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
Numerical Methods for Engineers
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
Introductory Mathematics for Engineering Applicat…
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
Mathematics For Machine Technology
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,
Basic Technical Mathematics
Basic Technical Mathematics
Advanced Math
ISBN:
9780134437705
Author:
Washington
Publisher:
PEARSON
Topology
Topology
Advanced Math
ISBN:
9780134689517
Author:
Munkres, James R.
Publisher:
Pearson,