Suppose a brewery uses a Cobb-Douglas production function for his production. He studies the producti process and finds the following. An additional machine-hour of fermentation capacity would ncrease output by 500 bottles per day (i.e. MPK = 500). An additional man-hour of lat would increase output by 1000 bottles per day
Q: Mariah Enterprises makes a variety of consumer electronic products. Its camera manufacturing plant…
A: Given that - The value of process output for Alpha = $150 per unit of product A and the value of…
Q: An operator works 8 hours per shift at $10/hr and 20% in fringe benefits. If the machine capacity is…
A:
Q: A process is designed to produce 2,050 units per hour. The process has a scrap rate of 0.9% and a…
A: Given data : Scrap rate=0.9 %= 0.009Inefficiencies=14%= 0.14The actual output of the process=1550…
Q: Assume you are the project manager for the Tidal 2 software project. You have been asked to…
A: Project management mechanism keeps the organization on course and allows for proper modifications…
Q: Atlanta Manufacturing Company produces products W, X, Y, and Z through a joint process. The joint…
A: To determine the effect on profits if product W is processed further, we will be using the following…
Q: A 6-pole, 50 Hz, 3-phase induction motor running on full load develops a useful torque of 160 Nm…
A:
Q: The binary variables in the fixed cost models correspond to: A.) The number of units or products…
A: The binary variable (0s and 1s) in the fixed cost model would correspond to the process for which…
Q: A machine shop manufactures two types of bolts. The bolts require time on each of the three groups…
A: Given: The selling price of type 1 bolt is $0.15 and bolt II is $0.20. In a day 300, 720, and 100…
Q: - The mean number of air conditioning units assembled per month by Freeze, Inc. is 750 and the…
A: Given Information :- Mean (μ) =750, Standard Deviation (σ)=100 Break even point (BEP) = 500
Q: A 10 station automated assembly system produces an ideal cycle time (Tc) of 14 seconds/cycle. When a…
A: Given Information - Total station automated assembly system = n = 10 Ideal cycle time = Tc = 14…
Q: snip
A: When a specific operation results in natural variation of output, it is categorized under…
Q: I need answer typing clear urjent no chatgpt used i will give upvotes full explanation pls
A: To analyze the problem involving the sliding vanes compressor and its working cycle shown in the…
Q: Link's Lumber creates pressure-treated utility poles from pine logs bought from several surrounding…
A: An important measure of economic performance is the so-called multifactor productivity (MFP), which…
Q: Calculate the manufacturing lead time if the average non-operation time is 2 hrs. Calculate the…
A: In manufacturing, lead time refers to the time that it takes to manufacture a product and deliver it…
Q: The Union Manufacturing Company is producing two types of products: A and B. The demand forecasts,…
A: Product AProduct BDemand forecast (units/yr)1,0004,000Batch size (units/batch)2010Processing time…
Q: Example: wing operati Al-Nojoom Company for advertising has identified the following operations as…
A: According to our guidelines, only first three sub parts can be answered, please post the rest…
Q: Determine the weekly product yield
A: Product yield is the sum of total item which are qualified for the sales after the production…
Q: Discuss the theoretical implications of the second law of thermodynamics on the efficiency limits of…
A: The second law of thermodynamics:We know that the second law of thermodynamics gives us the maximum…
Q: Which statement is true? A. In the Service (Productt) Processs matrix, the degree of labor…
A: Service process matrix can be defined as a classification matrix of the service industry firms based…
Q: Henson Automotive wants to understand how much water the company is using when manufacturing its…
A: Water is a vital resource available on earth. It is very difficult to imagine life without water. It…
Q: What is the function of a car's radiator? A) To heat the interior of the car B)…
A: The function of a car's radiator is a crucial aspect of the vehicle's cooling system. Let's go…
Q: For the production of part R-193, two operations are being considered. The capital investment…
A: Operation 1: Production per hr =1400 Adjustment time = 20 mins Labor cost per hr = 17 Selling price…
Q: The efficiency of an ideal Carnot engine depends on: a) The type of fuel used b) The temperatures…
A: The Carnot engine is a theoretical engine that operates on the reversible Carnot cycle. The Carnot…
Q: Sticky Manufacturing produces a variety of adhesive products. On one production line, the company…
A: Standard cost is the cost that is already estimated or predetermined that a company expects to incur…
Q: The Flip Chip Company manufactures nacho chips, potato chips, and related products. There has been a…
A: A bottleneck is a point of congestion in any system that slows things down overall. This could be…
Q: A firm has redesigned its production process so that it now takes 8 hours for a unit to be made.…
A: Production process take time(T) = 8 hour Old process take time(t) = 15 hour Flow rate(R) = 2 units…
Q: do fast step by step.
A: Step 1:Step 2:Step 3: Step 4:
Trending now
This is a popular solution!
Step by step
Solved in 3 steps
- The recipe for a fruit smoothie requires 2 cups of fruit per 6 cups of yogurt to maintain a 1/3 ratio. While making the fruit smoothie, Suzy accidentally puts 3 cups of fruit into the pitcher. How many cups of yogurt should be put out n the pitcher to maintain the ratio of 1/3?Operations producing high volume with low variety are classified as: a) High volume, high variety b) Low volume, low variety c) High volume, low visibility d) Low volume, high visibility???PLEASE ANSWER URGENTLY AND SHOW ALL CALCULATIONS QUESTION It takes a cycle of 12 minutes to mould 50 defect-free standard bricks plus 1 minute to adjust the machine for a brick-making machine operated by two machine operators paid R70/hr each. Another lower-capacity machine also takes 12 minutes to mould the bricks plus 36 seconds to adjust the machine, to produce 25 standard bricks operated by one operator paid R100 per hour. If both machines are operated 8 hours a day and a standard brick is sold at R2.00, determine which process should be selected?
- A machine makes two components; call them types A and B. It takes 630 seconds to switch production between the component types. During that time, no production occurs. When in production, each unit of A or B requires 0.5 second to be completed. The two components, A and B, are combined in an assembly process to make a final product; call it C. The assembly step can combine the two components into 1 unit every 4 seconds, or 15 units per minute. Suppose the machine rotates between one batch of 2,520 units of A and 2,520 units of B. In that case, what is the capacity of the machine in component pairs per minute, where a component pair is one unit of A and one unit of B?plessssWhich of the following is a typical characteristic a service process? Group of answer choices a Low customer contact b Perishable outputs c Tangible output d Low labor requirements e High levels of inventory f All of the above
- A bicycle component manufacturer produces hubs for bike wheels. Two processes are possible for manufacturing, and the parameters of each process are as follows: Process 1 Production rate Daily production time Process 2 35 parts/hour 4 hours/day 20% 15 parts/hour 7 hours/day 9% Percent parts rejected Assume that the daily demand for hubs allows all defect-free hubs to be sold. Select the process that maximizes profit per day if each part is made from $4 worth of material and can be sold for $30. Both processes are fully automated, and variable overhead cost is charged at the rate of $40 per hour.For the production of part R-193, two operations are being considered. The capital investment associated with each operation is identical. Operation 1 produces 2,100 parts per hour. After each hour, the tooling must be adjusted by the machine operator. This adjustment takes 15 minutes. The machine operator for Operation 1 is paid $24 per hour (this includes fringe benefits). Operation 2 produces 2,350 parts per hour, but the tooling needs to be adjusted by the operator only once every two hours. This adjustment takes 45 minutes. The machine operator for Operation 2 is paid $13 per hour (this includes fringe benefits). Assume an 8-hour workday. Further assume that all parts produced can be sold for $0.35 each. a. Should Operation 1 or Operation 2 be recommended? b. What is the basic tradeoff in this problem?In a job shop, effective capacity is only 88 percent of design capacity, and actual output is 69 percent of effective output. What design capacity would be needed to achieve an actual output of 11 jobs per week? What is its effective capacity?a. The Design Capacity needed to achieve the required actual job outputs =( ) (round to whole number)b. The Effective Capacity needed to achieve the required actual job outputs =( ) (round to whole number)
- The core of a transformer is laminated to:* - A. Increase weight - B. Reduce eddy current losses - C. Reduce hysteresis losses - D. Increase efficiency.A machine makes two components; call them types A and B. It takes 630 seconds to switch production between the component types. During that time, no production occurs. When in production, each unit of A or B requires 0.5 second to be completed. The two components, A and B, are combined in an assembly process to make a final product; call it C. The assembly step can combine the two components into 1 unit every 4 seconds, or 15 units per minute. Suppose the machine rotates between one batch of 2,520 units of A and 2,520 units of B. In that case, what is the capacity of the machine in component pairs per minute, where a component pair is one unit of A and one unit of B? Suppose the machine rotates between one batch of 2,520 units of A and 2,520 units of B. What is the utilization of the machine? Suppose the machine rotates between one batch of 2,520 units of A and 2,520 units of B. What is the average inventory of B components? If the production schedule could be adjusted with…How many units are needed to break even if eaxh completed unit has a value of $100?