Solve using excel Shelby Shelving is a small company that manufactures two types of shelves for grocery stores. Model S is the standard model and model LX is a heavy-duty version. Shelves are manufactured in three major steps: stamping, forming, and assembly. In the stamping stage, a large machine is used to stamp standard sheets of metal into appropriate sizes. In the forming stage, another machine bends the metal into shape. Assembly involves joining the parts with a combination of soldering and riveting. Since different amount of solder and rivets are used for assembly, they have different workstations.   Model S shelves are sold for 350???????????ℎ??????????????? 350 � � � � � � � � � � � ℎ � � � � � � � � � � � � � � � 405. Shelby’s operation is fairly small in the industry, and management believes it cannot raise prices beyond these levels because of the competition. However, the marketing department believes that Shelby can sell as much as it can produce at these prices. Within a given month, Shelby has 1,200 hours of stamping, 1,200 hours of forming and 1,000 hours of assembly available.  Each model S shelf requires 0.3 hours for stamping, 0.25 hours for forming, and 0.4 hours for assembly. Each model S shelf costs 80???ℎ??????????, 80 � � � ℎ � � � � � � � � � � , 120 per hour to form, and 165???ℎ?????????????.?ℎ??????????????????????????? 165 � � � ℎ � � � � � � � � � � � � � . � ℎ � � � � � � � � � � � � � � � � � � � � � � � � � � � 175 per unit.   Each model LX self requires 0.3 hours for stamping, 0.25 hours for forming, and 0.5 hours for assembly. Each model LX shelf costs 80???ℎ??????????, 80 � � � ℎ � � � � � � � � � � , 120 per hour to form, and 165???ℎ?????????????.?ℎ???????????????????????????? 165 � � � ℎ � � � � � � � � � � � � � . � ℎ � � � � � � � � � � � � � � � � � � � � � � � � � � � � 210 per unit.  They want 60% of the production dedicated to model LX shelves.

Advanced Engineering Mathematics
10th Edition
ISBN:9780470458365
Author:Erwin Kreyszig
Publisher:Erwin Kreyszig
Chapter2: Second-order Linear Odes
Section: Chapter Questions
Problem 1RQ
icon
Related questions
Question

Solve using excel

Shelby Shelving is a small company that manufactures two types of shelves for grocery stores. Model S is the standard model and model LX is a heavy-duty version. Shelves are manufactured in three major steps: stamping, forming, and assembly. In the stamping stage, a large machine is used to stamp standard sheets of metal into appropriate sizes. In the forming stage, another machine bends the metal into shape. Assembly involves joining the parts with a combination of soldering and riveting. Since different amount of solder and rivets are used for assembly, they have different workstations.  

Model S shelves are sold for $350 and model LX shelves are sold for $405. Shelby’s operation is fairly small in the industry, and management believes it cannot raise prices beyond these levels because of the competition. However, the marketing department believes that Shelby can sell as much as it can produce at these prices. Within a given month, Shelby has 1,200 hours of stamping, 1,200 hours of forming and 1,000 hours of assembly available. 

Each model S shelf requires 0.3 hours for stamping, 0.25 hours for forming, and 0.4 hours for assembly. Each model S shelf costs $80 per hour to stamp, $120 per hour to form, and $165 per hour to assemble. The cost of materials for model S is $175 per unit.  

Each model LX self requires 0.3 hours for stamping, 0.25 hours for forming, and 0.5 hours for assembly. Each model LX shelf costs $80 per hour to stamp, $120 per hour to form, and $165 per hour to assemble. The cost of materials for model LX is $210 per unit. 

They want 60% of the production dedicated to model LX shelves.  

Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps

Blurred answer
Recommended textbooks for you
Advanced Engineering Mathematics
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
Numerical Methods for Engineers
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
Introductory Mathematics for Engineering Applicat…
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
Mathematics For Machine Technology
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,
Basic Technical Mathematics
Basic Technical Mathematics
Advanced Math
ISBN:
9780134437705
Author:
Washington
Publisher:
PEARSON
Topology
Topology
Advanced Math
ISBN:
9780134689517
Author:
Munkres, James R.
Publisher:
Pearson,