- Soil Compaction 1. A series of Modified Proctor Tests have been perfomed on a soil that has a unit weight of 26,290.8 N/m2. The volume and mass of the empty mold are 1/30 ft and 1.970 kg, respectively. The test results obtained are as follows: Moisture Content Test Results Mass of Can Mass of Can+Moist Mass of Can + Dry Soil (2) Point No. Mass of Compacted Soil (g) Soil+Mold (kg) 1 3.673 22.11 205.74 196.33 3.798 23.85 194.20 180.54 3.927 19.74 196.24 177.92 3.983 20.03 187.43 165.71 3.932 21.99 199.59 171.11 a. Plot the compaction curve. You are allowed to use spreadsheet program such as Microsoft excel. Show your sample calculation for Test No. 1 in your asnwer sheet.

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question

Show complete calculations.

Use Excel to plot the graph.

- Soil Compaction
1. A series of Modified Proctor Tests have been perfomed on a soil that has a unit weight
of 26,290.8 N/m. The volume and mass of the empty mold are 1/30 ft and 1.970 kg,
respectively. The test results obtained are as follows:
Moisture Content Test Results
Mass of Can Mass of Can+Moist Mass of Can +
(2)
Point No. Mass of
Compacted
Soil ()
Dry Soil (g)
Soil+Mold (kg)
3.673
22.11
205.74
196.33
2
3.798
23.85
194.20
180.54
3.927
19.74
196.24
177.92
3.983
20.03
187.43
165.71
3.932
21.99
199.59
171.11
a. Plot the compaction curve. You are allowed to use spreadsheet program such as
Microsoft excel. Show your sample calculation for Test No. 1 in your asnwer sheet.
Transcribed Image Text:- Soil Compaction 1. A series of Modified Proctor Tests have been perfomed on a soil that has a unit weight of 26,290.8 N/m. The volume and mass of the empty mold are 1/30 ft and 1.970 kg, respectively. The test results obtained are as follows: Moisture Content Test Results Mass of Can Mass of Can+Moist Mass of Can + (2) Point No. Mass of Compacted Soil () Dry Soil (g) Soil+Mold (kg) 3.673 22.11 205.74 196.33 2 3.798 23.85 194.20 180.54 3.927 19.74 196.24 177.92 3.983 20.03 187.43 165.71 3.932 21.99 199.59 171.11 a. Plot the compaction curve. You are allowed to use spreadsheet program such as Microsoft excel. Show your sample calculation for Test No. 1 in your asnwer sheet.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Knowledge Booster
Project cash flow
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning