Smithson Mining operates a silver mine in Nevada. Acquisition, exploration, and development costs totaled $6.5 million. After the silver is extracted in approximately five years, Smithson is obligated to restore the land to its original condition, including constructing a wildlife preserve. The company’s controller has provided the following three cash flow possibilities for the restoration costs: (1) $590,000, 30% probability; (2) $640,000, 45% probability; and (3) $740,000, 25% probability. The company’s credit-adjusted, risk-free rate of interest is 5%. (FV of $1, PV of $1, FVA of $1, PVA of $1, FVAD of $1 and PVAD of $1) (Use appropriate factor(s) from the tables provided.) What is the initial cost of the silver mine? (Enter your answers in whole dollars.) Do not give answer in image formate
Smithson Mining operates a silver mine in Nevada. Acquisition, exploration, and development costs totaled $6.5 million. After the silver is extracted in approximately five years, Smithson is obligated to restore the land to its original condition, including constructing a wildlife preserve. The company’s controller has provided the following three
What is the initial cost of the silver mine? (Enter your answers in whole dollars.) Do not give answer in image formate |
Trending now
This is a popular solution!
Step by step
Solved in 3 steps with 1 images