Skip to question [The following information applies to the questions displayed below.] Sweeten Company had no jobs in progress at the beginning of the year and no beginning inventories. It started, completed, and sold only two jobs during the year—Job P and Job Q. The company uses a plantwide predetermined overhead rate based on machine-hours. At the beginning of the year, it estimated that 4,000 machine-hours would be required for the period’s estimated level of production. Sweeten also estimated $25,000 of fixed manufacturing overhead cost for the coming period and variable manufacturing overhead of $1.70 per machine-hour. Because Sweeten has two manufacturing departments—Molding and Fabrication—it is considering replacing its plantwide overhead rate with departmental rates that would also be based on machine-hours. The company gathered the following additional information to enable calculating departmental overhead rates: Molding Fabrication Total Estimated total machine-hours used 2,500 1,500 4,000 Estimated total fixed manufacturing overhead $ 10,000 $ 15,000 $ 25,000 Estimated variable manufacturing overhead per machine-hour $ 1.40 $ 2.20 The direct materials cost, direct labor cost, and machine-hours used for Jobs P and Q are as follows: Job P Job Q Direct materials $ 13,000 $ 8,000 Direct labor cost $ 21,000 $ 7,500 Actual machine-hours used: Molding 1,700 800 Fabrication 600 900 Total 2,300 1,700 Sweeten Company had no overapplied or underapplied manufacturing overhead costs during the year. Required: For questions 1-8, assume that Sweeten Company uses a plantwide predetermined overhead rate with machine-hours as the allocation base. For questions, 9-15, assume that the company uses predetermined departmental overhead rates with machine-hours as the allocation base in both departments. Foundational 2-3 (Static) 3. What is the total manufacturing cost assigned to Job P? (Do not round intermediate calculations. Round your final answer to nearest whole dollar.)
Variance Analysis
In layman's terms, variance analysis is an analysis of a difference between planned and actual behavior. Variance analysis is mainly used by the companies to maintain a control over a business. After analyzing differences, companies find the reasons for the variance so that the necessary steps should be taken to correct that variance.
Standard Costing
The standard cost system is the expected cost per unit product manufactured and it helps in estimating the deviations and controlling them as well as fixing the selling price of the product. For example, it helps to plan the cost for the coming year on the various expenses.
The Foundational 15 (Static) [LO2-1, LO2-2, LO2-3, LO2-4]
Skip to question
[The following information applies to the questions displayed below.]
Sweeten Company had no jobs in progress at the beginning of the year and no beginning inventories. It started, completed, and sold only two jobs during the year—Job P and Job Q. The company uses a plantwide predetermined
Because Sweeten has two manufacturing departments—Molding and Fabrication—it is considering replacing its plantwide overhead rate with departmental rates that would also be based on machine-hours. The company gathered the following additional information to enable calculating departmental overhead rates:
Molding | Fabrication | Total | |
---|---|---|---|
Estimated total machine-hours used | 2,500 | 1,500 | 4,000 |
Estimated total fixed manufacturing overhead | $ 10,000 | $ 15,000 | $ 25,000 |
Estimated variable manufacturing overhead per machine-hour | $ 1.40 | $ 2.20 |
The direct materials cost, direct labor cost, and machine-hours used for Jobs P and Q are as follows:
Job P | Job Q | |
---|---|---|
Direct materials | $ 13,000 | $ 8,000 |
Direct labor cost | $ 21,000 | $ 7,500 |
Actual machine-hours used: | ||
Molding | 1,700 | 800 |
Fabrication | 600 | 900 |
Total | 2,300 | 1,700 |
Sweeten Company had no overapplied or underapplied manufacturing overhead costs during the year.
Required:
For questions 1-8, assume that Sweeten Company uses a plantwide predetermined overhead rate with machine-hours as the allocation base. For questions, 9-15, assume that the company uses predetermined departmental overhead rates with machine-hours as the allocation base in both departments.
Foundational 2-3 (Static)
3. What is the total
The plantwide overhead rate is a single overhead rate that a company uses to allocate all of its manufacturing overhead costs to all jobs
Plantwide overhead rate = Total manufacturing cost/ Total machine hours
Step by step
Solved in 2 steps