Situation 3: A skier of mass 78.0 kg is pulled up a slope by a motor-driven cable. 21. How much work is required to pull the skier a distance of 50.0 m up a 40.0° slope (assumed frictionless) at a constant speed of 3.20 m/s? 22. A motor of what power (Watts) is required to perform this task?

icon
Related questions
Question
Situation 3: A skier of mass 78.0 kg is pulled up a slope by a motor-driven cable.
21. How much work is required to pull the skier a distance of 50.0 m up a 40.0° slope (assumed
frictionless) at a constant speed of 3.20 m/s?
22. A motor of what power (Watts) is required to perform this task?
Transcribed Image Text:Situation 3: A skier of mass 78.0 kg is pulled up a slope by a motor-driven cable. 21. How much work is required to pull the skier a distance of 50.0 m up a 40.0° slope (assumed frictionless) at a constant speed of 3.20 m/s? 22. A motor of what power (Watts) is required to perform this task?