select all correct options.

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question

select all correct options. 

For what conditions of Warrant 1 does the intersection below meet? Select all that apply.
Sutton Place
Speed Limit
35 mi/hr on Elm Street
25 i/hr on Sutton Place
Accidents:
Elm Street
2 Rear-End, PDO
2 Right angle with
injuries
1 Pedestrian fatality
2 Left-turn accidents
Pedestrian Delay. 30 s/veh
Time
Elm Street Vol. Sutton Place Vol.
(vph)
Pedestrian
Volume (ped/h)
Crossing Elm
(vph) .
WB Tot
230 720
210 635
225 570
230 515
325 685
245 620
330 630
225 655
280 620
310 690
205 425
230 680
EB
NB
SB
Tot
8-9 AM
490
535
205 740
140
9 - 10 AM
10 - 11 AM
11 - 12 PM
12 -1 PM
1-2 PM
2-3 PM
3-4 PM
4-5 PM
425
220 565
385 925
215 760
245 610
290 775
390 770
345
115
345
540
125
285
545
365
110
360
115
375
485
120
300
380
130
430
490
265 755
115
340
575
380 955
100
5-6 PM
9- 10 PM
10 -11 PM
380
500
290 790
115
335 705
400 755
220
370
125
450
355
100
O Condition A at is Met at 100%
O Condition B is Met at 100%
O Conditions A is Met at 80%
O Condition B is Met at 80%
O Warrant 1 is Met
Warrant 1 is not Met
Transcribed Image Text:For what conditions of Warrant 1 does the intersection below meet? Select all that apply. Sutton Place Speed Limit 35 mi/hr on Elm Street 25 i/hr on Sutton Place Accidents: Elm Street 2 Rear-End, PDO 2 Right angle with injuries 1 Pedestrian fatality 2 Left-turn accidents Pedestrian Delay. 30 s/veh Time Elm Street Vol. Sutton Place Vol. (vph) Pedestrian Volume (ped/h) Crossing Elm (vph) . WB Tot 230 720 210 635 225 570 230 515 325 685 245 620 330 630 225 655 280 620 310 690 205 425 230 680 EB NB SB Tot 8-9 AM 490 535 205 740 140 9 - 10 AM 10 - 11 AM 11 - 12 PM 12 -1 PM 1-2 PM 2-3 PM 3-4 PM 4-5 PM 425 220 565 385 925 215 760 245 610 290 775 390 770 345 115 345 540 125 285 545 365 110 360 115 375 485 120 300 380 130 430 490 265 755 115 340 575 380 955 100 5-6 PM 9- 10 PM 10 -11 PM 380 500 290 790 115 335 705 400 755 220 370 125 450 355 100 O Condition A at is Met at 100% O Condition B is Met at 100% O Conditions A is Met at 80% O Condition B is Met at 80% O Warrant 1 is Met Warrant 1 is not Met
Expert Solution
steps

Step by step

Solved in 3 steps

Blurred answer
Knowledge Booster
Exterior finishes for wood light frame
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning