SCENARIO The Client who is a private investor needs a 5 storey, framed college building. The building frameprovides the structure for a series of high specification lecture rooms, exhibition hall and meetingrooms which are intended to be built in the south of England, around Heathrow Airport. The collegeblock can be developed with steel or concrete or a combination of both. The college block has a plandimension of 50m by 24 m. The span of the beams and columns can be chosen based onRC or steel frame. Outside the college building, there is a space to be used for exhibitions whichneeds to be covered with a tensile structure. Please: Assess the most effective foundation type for a given scenario in terms of ease and speed of construction, economics, safety and environmental factors (Minimum 3 types).
SCENARIO
The Client who is a private investor needs a 5 storey, framed college building. The building frame
provides the structure for a series of high specification lecture rooms, exhibition hall and meeting
rooms which are intended to be built in the south of England, around Heathrow Airport. The college
block can be developed with steel or concrete or a combination of both. The college block has a plan
dimension of 50m by 24 m. The span of the beams and columns can be chosen based on
RC or steel frame. Outside the college building, there is a space to be used for exhibitions which
needs to be covered with a tensile structure.
Please: Assess the most effective foundation type for a given scenario in terms of ease and speed of construction, economics, safety and environmental factors (Minimum 3 types).
Unlock instant AI solutions
Tap the button
to generate a solution