Scenario: A new commercial development is planned in a 100-acre area with 85% imperviousness. To mitigate increased runoff, a detention basin is required. Design a basin to ensure the post-development 10-year, 24-hour storm peak discharge does not exceed the pre-development condition.

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question

Designing a detention  Basin

**Scenario:** A new commercial development is planned in a 100-acre area with 85% imperviousness. To mitigate increased runoff, a detention basin is required. Design a basin to ensure the post-development 10-year, 24-hour storm peak discharge does not exceed the pre-development condition.

**Explanation:**

This text is about a planning scenario for a new commercial development. The development is planned on a 100-acre land area, where 85% of the surface is impervious. Impervious surfaces, like pavements and rooftops, do not allow water to infiltrate into the ground, leading to increased surface runoff.

To manage this runoff and prevent potential flooding, the scenario outlines a requirement to design a detention basin. A detention basin is a structure designed to hold excess runoff temporarily and release it slowly, ensuring that the rate of stormwater runoff post-development does not exceed the pre-development rate.

This particular requirement is geared towards managing runoff from a hypothetical storm that has a probability of occurring once every 10 years, lasting for 24 hours. The goal is to design the detention basin such that the peak discharge levels from this event after the development do not surpass those before the development.
Transcribed Image Text:**Scenario:** A new commercial development is planned in a 100-acre area with 85% imperviousness. To mitigate increased runoff, a detention basin is required. Design a basin to ensure the post-development 10-year, 24-hour storm peak discharge does not exceed the pre-development condition. **Explanation:** This text is about a planning scenario for a new commercial development. The development is planned on a 100-acre land area, where 85% of the surface is impervious. Impervious surfaces, like pavements and rooftops, do not allow water to infiltrate into the ground, leading to increased surface runoff. To manage this runoff and prevent potential flooding, the scenario outlines a requirement to design a detention basin. A detention basin is a structure designed to hold excess runoff temporarily and release it slowly, ensuring that the rate of stormwater runoff post-development does not exceed the pre-development rate. This particular requirement is geared towards managing runoff from a hypothetical storm that has a probability of occurring once every 10 years, lasting for 24 hours. The goal is to design the detention basin such that the peak discharge levels from this event after the development do not surpass those before the development.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps with 2 images

Blurred answer
Knowledge Booster
Evaporation
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning