RMC, Inc., is a small firm that produces a variety of chemical products. In a particular production process, three raw materials are blended (mixed together) to produce two products: a fuel additive and a solvent base. Each ton of fuel additive is a mixture of 25 ton of material 1 and 35 of material 3. A ton of solvent base is a mixture of 12 ton of material 1, 15 ton of material 2, and 310 ton of material 3. After deducting relevant costs, the profit contribution is $40 for every ton of fuel additive produced and $30 for every ton of solvent base produced. RMC’s production is constrained by a limited availability of the three raw materials. For the current production period, RMC has available the following quantities of each raw material: RAW MATERIAL Amount Available for Production Material 1 20 Tons Material 2 5 Tons Material 3 21 Tons Assuming that RMC is interested in maximizing the total profit contribution, answer the following: What is the linear programming model for this problem? Find the optimal solution using the graphical solution procedure. How many tons of each product should be produced, and what is the projected total profit contribution? Is there any unused material? If so, how much? Are any of the constraints redundant? If so, which ones?
RMC, Inc., is a small firm that produces a variety of chemical products. In a particular production process, three raw materials are blended (mixed together) to produce two products: a fuel additive and a solvent base. Each ton of fuel additive is a mixture of 25 ton of material 1 and 35 of material 3. A ton of solvent base is a mixture of 12 ton of material 1, 15 ton of material 2, and 310 ton of material 3. After deducting relevant costs, the profit contribution is $40 for every ton of fuel additive produced and $30 for every ton of solvent base produced.
RMC’s production is constrained by a limited availability of the three raw materials. For the current production period, RMC has available the following quantities of each raw material:
RAW MATERIAL Amount Available for Production
Material 1 20 Tons
Material 2 5 Tons
Material 3 21 Tons
Assuming that RMC is interested in maximizing the total profit contribution, answer the following:
What is the linear programming model for this problem?
Find the optimal solution using the graphical solution procedure. How many tons of each product should be produced, and what is the projected total profit contribution?
Is there any unused material? If so, how much?
Are any of the constraints redundant? If so, which ones?
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 1 images