Question Question: if you know that, a Loop levelling started and ended on known benchmarks (BM 1073 and BM 1074) as shown below. There are 3 instrument locations (L1, L2, L3) and 2 change points (D, G). Additionally, there are 5 intermediate sight points (A, B, C, E, F). The staff readings are presented on the sketch below. The elevation of BM 1073 is equal to 15.452m. Calculate the reduced level of all unknown points (A, B, C, D, E, F, G, and BM 1074) using the Height of the instrument method and the Rise and Fall method? Present your work in two separate tables. B F 0.9070 AQ 0.87X E Q0.808 0.765 2.005 1.322 1.805 1.904 1.090 L2 G 2.355 BM 1073 15.452m L, 1.411 L3 C BM 1074
Question Question: if you know that, a Loop levelling started and ended on known benchmarks (BM 1073 and BM 1074) as shown below. There are 3 instrument locations (L1, L2, L3) and 2 change points (D, G). Additionally, there are 5 intermediate sight points (A, B, C, E, F). The staff readings are presented on the sketch below. The elevation of BM 1073 is equal to 15.452m. Calculate the reduced level of all unknown points (A, B, C, D, E, F, G, and BM 1074) using the Height of the instrument method and the Rise and Fall method? Present your work in two separate tables. B F 0.9070 AQ 0.87X E Q0.808 0.765 2.005 1.322 1.805 1.904 1.090 L2 G 2.355 BM 1073 15.452m L, 1.411 L3 C BM 1074
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
Related questions
Question

Transcribed Image Text:Question
Question: if you know that, a Loop levelling started and ended on known benchmarks (BM 1073
and BM 1074) as shown below. There are 3 instrument locations (L1, L2, L3) and 2 change points
(D, G). Additionally, there are 5 intermediate sight points (A, B, C, E, F). The staff readings are
presented on the sketch below. The elevation of BM 1073 is equal to 15.452m.
Calculate the reduced level of all unknown points (A, B, C, D, E, F, G, and BM 1074)
using the Height of the instrument method and the Rise and Fall method? Present
your work in two separate tables.
B
F
0.9070
AQ
0.87X
E
Q0.808
0.765
2.005
1.322
1.805
1.904.
1.090
L2
G
2.355
BM 1073
15.452m
D
1.411
L3
C
BM 1074
Expert Solution

This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 1 images

Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you


Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON

Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning


Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON

Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning

Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education


Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning