QUESTION 7 A company manufactures two types of toys: T1 and T2 using the machines A, B and C. The time required to make T1 is 6, 8 and 12 hours in A, B and C respectively. The time required to make T2 is 8, 4 and 4 hours in A, B and C respectively. The maximum available times for the machine A, B and C are 380, 300 and 404 hours respectively. The profits on T1 and T2 toys are 5 and 3 OMR respectively. Let x = number of toys (T1); y = number of toys (T2). The constraint for the time on machine Ais 8x + 6y ≤ 380 6x + 8y ≥ 380 8x + 6y ≥ 380 6x + 8y ≤ 380
QUESTION 7 A company manufactures two types of toys: T1 and T2 using the machines A, B and C. The time required to make T1 is 6, 8 and 12 hours in A, B and C respectively. The time required to make T2 is 8, 4 and 4 hours in A, B and C respectively. The maximum available times for the machine A, B and C are 380, 300 and 404 hours respectively. The profits on T1 and T2 toys are 5 and 3 OMR respectively. Let x = number of toys (T1); y = number of toys (T2). The constraint for the time on machine Ais 8x + 6y ≤ 380 6x + 8y ≥ 380 8x + 6y ≥ 380 6x + 8y ≤ 380
Advanced Engineering Mathematics
10th Edition
ISBN:9780470458365
Author:Erwin Kreyszig
Publisher:Erwin Kreyszig
Chapter2: Second-order Linear Odes
Section: Chapter Questions
Problem 1RQ
Related questions
Topic Video
Question
QUESTION 7
A company manufactures two types of toys: T1 and T2 using the machines A, B and C. The time required to make T1 is 6, 8 and 12 hours in A, B and C respectively. The time required to make T2 is 8, 4 and 4 hours in A, B and C respectively. The maximum available times for the machine A, B and C are 380, 300 and 404 hours respectively. The profits on T1 and T2 toys are 5 and 3 OMR respectively.
Let x = number of toys (T1); y = number of toys (T2).
The constraint for the time on machine Ais
8x + 6y ≤ 380
6x + 8y ≥ 380
8x + 6y ≥ 380
6x + 8y ≤ 380
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 3 steps
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, advanced-math and related others by exploring similar questions and additional content below.Recommended textbooks for you
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,