Question 1: The cumulated precipitation recorded for a given event in Fairfax, VA, is shown in the table with time increments of 15 minutes. a) Plot the cumulative mass curve for rainfall. Develop the rainfall mass curve and hyetograph for this event. b) Develop the rainfall hyetograph for this event. c) Find the time when the maximum intensity rainfall was recorded in in/hr. Time P. cum [hh:mm] [in] 00:00 0.00 00:15 1.13 00:30 2.04 00:45 3.34 01:00 3.71 01:15 3.79 01:30 3.84 01:45 4.00 02:00 4.04 02:15 4.13 02:30 4.13 02:45 4.17 03:00 4.17

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
Question 1: The cumulated precipitation recorded for a given event in Fairfax, VA, is shown in
the table with time increments of 15 minutes.
a) Plot the cumulative mass curve for rainfall. Develop the rainfall mass curve and
hyetograph for this event.
b) Develop the rainfall hyetograph for this event.
c) Find the time when the maximum intensity rainfall was recorded in in/hr.
Time
Pcum
[hh:mm]
[in]
00:00
0.00
00:15
1.13
00:30
2.04
00:45
3.34
01:00
3.71
01:15
3.79
01:30
3.84
01:45
4.00
02:00
4.04
02:15
4.13
02:30
4.13
02:45
4.17
03:00
4.17
Transcribed Image Text:Question 1: The cumulated precipitation recorded for a given event in Fairfax, VA, is shown in the table with time increments of 15 minutes. a) Plot the cumulative mass curve for rainfall. Develop the rainfall mass curve and hyetograph for this event. b) Develop the rainfall hyetograph for this event. c) Find the time when the maximum intensity rainfall was recorded in in/hr. Time Pcum [hh:mm] [in] 00:00 0.00 00:15 1.13 00:30 2.04 00:45 3.34 01:00 3.71 01:15 3.79 01:30 3.84 01:45 4.00 02:00 4.04 02:15 4.13 02:30 4.13 02:45 4.17 03:00 4.17
Expert Solution
Step 1

solution:

Time

(hh:mm)

PCUM

(in)

i

Intensity

00:00 0.00 0
00:15 1.13 0.075
00:30 2.04 0.061
00:45 3.34 0.087
01:00 3.71 0.025
01:15 3.79 0.005
01:30 3.84 0.003
01:45 4.00 0.011
02:00 4.04 0.003
02:15 4.13 0.006
02:30 4.13 0
02:45 4.17 0.003
03:00

4.17

0

 

steps

Step by step

Solved in 3 steps with 2 images

Blurred answer
Knowledge Booster
Probability, risk and uncertainty analysis for hydrological design
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning