Q5: A 50m*30m site has 1 m thick layer of organic soil, to be replaced with granular fill (G-2.6) with 21% fines and 31% oversized particles (Gos = 2.60 and wssp = 1.9%). The site is prepared for 10-story building with a parking lot. Standard Proctor tests are performed on the fill material without oversized particles, and the test results are shown below. Yd.zara. Compaction test Moisture content (%) Wet unit weight (kN/m³) 8.8 16 10.6 18.1 12.7 -19.4 14.7 18.7 16.6 16.9 1) What are the key performance parameters? 2) Determine the parameters needed for field compaction. 3) If the average productivity of a single compactor is 30 m³/hr, how many days are need to finish the compaction work, assuming 8 working hours per day?

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
i need the answer quickly
Q5: A 50m*30m site has 1 m thick layer of organic soil, to be replaced with granular fill (G-2.6) with 21%
fines and 31% oversized particles (Gos= 2.60 and wssp = 1.9%). The site is prepared for 10-story building
with a parking lot. Standard Proctor tests are performed on the fill material without oversized particles,
and the test results are shown below.
Yo.za
Compaction test
Moisture content (%) Wet unit weight (kN/m³)
8.8
16
10.6
18.1
12.7
19.4
14.7
18.7
16.6
16.9
1) What are the key performance parameters?
2) Determine the parameters needed for field compaction.
3) If the average productivity of a single compactor is 30 m³/hr, how many days are need to finish the
compaction work, assuming 8 working hours per day?
LA C
Transcribed Image Text:Q5: A 50m*30m site has 1 m thick layer of organic soil, to be replaced with granular fill (G-2.6) with 21% fines and 31% oversized particles (Gos= 2.60 and wssp = 1.9%). The site is prepared for 10-story building with a parking lot. Standard Proctor tests are performed on the fill material without oversized particles, and the test results are shown below. Yo.za Compaction test Moisture content (%) Wet unit weight (kN/m³) 8.8 16 10.6 18.1 12.7 19.4 14.7 18.7 16.6 16.9 1) What are the key performance parameters? 2) Determine the parameters needed for field compaction. 3) If the average productivity of a single compactor is 30 m³/hr, how many days are need to finish the compaction work, assuming 8 working hours per day? LA C
Expert Solution
steps

Step by step

Solved in 7 steps with 1 images

Blurred answer
Knowledge Booster
Asphalt binders and mixtures
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning