Q4: In a Six Stages Pipeline machine; consider the following program fragment: Instruction Instruction Code PROC CE_AQU SUB MOV Y, 5 Address 300 302 X, X 304 Y, X 328 I/Branch if 0 306 SUB 308 BRZ 306 LD Z, M[W] : 328 INC X 330 ENDP With Branch is resolved at the end of the El stage (fifth stage), calculate the following if; A. Branch instruction is Not Taken: Total # of instructions executed = Total # of clock cycles required = CPI = B. Branch instruction is Taken: Total # of instructions executed = Total # of clock cycles required% = CPI =

Computer Networking: A Top-Down Approach (7th Edition)
7th Edition
ISBN:9780133594140
Author:James Kurose, Keith Ross
Publisher:James Kurose, Keith Ross
Chapter1: Computer Networks And The Internet
Section: Chapter Questions
Problem R1RQ: What is the difference between a host and an end system? List several different types of end...
icon
Related questions
Question
100%
Q4: In a Six Stages Pipeline machine; consider the following program fragment:
Instruction Instruction
Address
Code
PROC CE_AQU
Х, Х
300
302
SUB
304
MOV
Y, 5
306
SUB
Y, X
308
BRZ
328 I/Branch if 0
306
LD Z, M[W]
328
INC
330
ENDP
With Branch is resolved at the end of the El stage (fifth stage), calculate the following if;
A. Branch instruction is Not Taken:
Total # of instructions executed =
Total # of clock cycles required =
CPI =
B. Branch instruction is Taken:
Total # of instructions executed =
Total # of clock cycles required =
CPI =
The branch penalty? =
time cycles
fast
Transcribed Image Text:Q4: In a Six Stages Pipeline machine; consider the following program fragment: Instruction Instruction Address Code PROC CE_AQU Х, Х 300 302 SUB 304 MOV Y, 5 306 SUB Y, X 308 BRZ 328 I/Branch if 0 306 LD Z, M[W] 328 INC 330 ENDP With Branch is resolved at the end of the El stage (fifth stage), calculate the following if; A. Branch instruction is Not Taken: Total # of instructions executed = Total # of clock cycles required = CPI = B. Branch instruction is Taken: Total # of instructions executed = Total # of clock cycles required = CPI = The branch penalty? = time cycles fast
Expert Solution
steps

Step by step

Solved in 3 steps with 1 images

Blurred answer
Recommended textbooks for you
Computer Networking: A Top-Down Approach (7th Edi…
Computer Networking: A Top-Down Approach (7th Edi…
Computer Engineering
ISBN:
9780133594140
Author:
James Kurose, Keith Ross
Publisher:
PEARSON
Computer Organization and Design MIPS Edition, Fi…
Computer Organization and Design MIPS Edition, Fi…
Computer Engineering
ISBN:
9780124077263
Author:
David A. Patterson, John L. Hennessy
Publisher:
Elsevier Science
Network+ Guide to Networks (MindTap Course List)
Network+ Guide to Networks (MindTap Course List)
Computer Engineering
ISBN:
9781337569330
Author:
Jill West, Tamara Dean, Jean Andrews
Publisher:
Cengage Learning
Concepts of Database Management
Concepts of Database Management
Computer Engineering
ISBN:
9781337093422
Author:
Joy L. Starks, Philip J. Pratt, Mary Z. Last
Publisher:
Cengage Learning
Prelude to Programming
Prelude to Programming
Computer Engineering
ISBN:
9780133750423
Author:
VENIT, Stewart
Publisher:
Pearson Education
Sc Business Data Communications and Networking, T…
Sc Business Data Communications and Networking, T…
Computer Engineering
ISBN:
9781119368830
Author:
FITZGERALD
Publisher:
WILEY